EMBR HOME has 123 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Mar 7, 2025 to Aug 26, 2026), most of them in Fresno County (63), San Bernardino County (39) and Los Angeles County (5). CSLB lists license 1127287 (EMBR HOME) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Oct 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 123
- Last 24 months
- 123
- Total capacity
- 1,010.3 kW DC
- Median system size
- 8.1 kW DC
- With battery storage
- 99.2% all time; 99.2% last 24 months
- Third-party owned
- 2.4% of 123 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 112 installs, latest Aug 26, 2026
- Ownership types recorded
- PPA 3
- Median battery size
- 13.5 kWh (104 installs list a capacity)
- First install
- Mar 7, 2025
- Latest install
- Aug 26, 2026
- Counties
- 10
- Utilities
- PGE 74, SCE 49
- CSLB license
- 1127287
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2025 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2025 | 58 | 57 |
| 2026 (through Aug 31, 2026) | 65 | 65 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
112 of its 123 interconnected installs (91.1% of the 123 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 3 | 2.4% | not counted |
| NEM 2.0 | 8 | 6.5% | 8 (100.0%) |
| Net Billing Tariff | 112 | 91.1% | 111 (99.1%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 3 of EMBR HOME’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches EMBR HOME exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun | 3 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 116 of EMBR HOME’s 123 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (46, 39.7%) used modules recorded as EG4.
In the last 24 months, 123 of EMBR HOME’s 123 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (67, 54.5%) used inverters recorded as Enphase.
In the last 24 months, 70 of EMBR HOME’s 123 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (54, 77.1%) used batteries recorded as Enphase.
70 of 122 battery-paired PG&E and SCE installs (57.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | EG4 | 46 | 46 |
| Seraphim | 39 | 39 | |
| Aptos Solar | 27 | 27 | |
| Qcells | 25 | 25 | |
| Mission Solar | 17 | 17 | |
| Inverter maker | Enphase | 67 | 67 |
| EG4 | 51 | 51 | |
| SolarEdge | 29 | 29 | |
| Tesla | 15 | 15 | |
| ABB | 8 | 8 | |
| Battery maker | Enphase | 54 | 54 |
| Tesla | 14 | 14 | |
| EG4 | 1 | 1 | |
| Enpahse Energy | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 116 of 123 installs, inverters on 123. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1127287 | EMBR HOME (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Oct 3, 2024 | Oct 31, 2028 | 123 |
License numbers are the ones the utilities recorded on the interconnection applications (123 of 123 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1127287. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Fresno | 63 |
| San Bernardino | 39 |
| Los Angeles | 5 |
| Madera | 4 |
| Tulare | 4 |
| Kings | 3 |
| Kern | 2 |
| Mariposa | 1 |
| Orange | 1 |
| Riverside | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 53 |
| San Bernardino | 18 |
| Clovis | 5 |
| Fontana | 5 |
| Redlands | 4 |
| Rialto | 4 |
| Bloomington | 3 |
| Los Angeles | 3 |
| Madera | 3 |
| Avenal | 2 |
| Bakersfield | 2 |
| Downey | 2 |
| Ontario | 2 |
| Orosi | 2 |
| Reedley | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| EMBR HOME | 123 |
Common questions
Where does EMBR HOME install solar?
Its installs are spread across 10 counties. The most are in Fresno County (63 installs), followed by San Bernardino County (39).
How often does EMBR HOME install batteries with solar?
99.2% of its interconnected solar installs include battery storage across all years, and 99.2% in the last 24 months (122 of 123).
How many EMBR HOME installs are under NEM 3.0 (the Net Billing Tariff)?
112 of its 123 interconnected installs (91.1% of the 123 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.