Big Star Builders

How many solar installs has Big Star Builders done in California, and which license number is on its installs?

Big Star Builders has 34 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Mar 17, 2018 to Feb 6, 2020), most of them in Contra Costa County (3), Santa Clara County (3) and Tehama County (3). The license number recorded on most of its installs, 711083, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
0
Total capacity
199.9 kW DC
Median system size
5.4 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 17, 2018
Latest install
Feb 6, 2020
Counties
24
Utilities
PGE 31, SCE 3
CSLB license
711083

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018270
201960
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.034100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Big Star Builders’s installs. No residential system in the file lists a third-party owner name that matches Big Star Builders exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 32 of Big Star Builders’ 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (30, 93.8%) used modules recorded as Silfab.

Across all years, 34 of Big Star Builders’ 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 79.4%) used inverters recorded as Fronius.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab030
Hyundai01
LG01
Inverter makerFronius027
SolarEdge06
Enphase02
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 32 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
711083Not found in the CSLB License Master file pulled Nov 4, 202633

License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Contra Costa3
Santa Clara3
Tehama3
Glenn2
Humboldt2
Lake2
Shasta2
Alameda1
Amador1
Butte1
El Dorado1
Kern1
Madera1
Mariposa1
Monterey1
Orange1
Placer1
Riverside1
San Benito1
San Joaquin1
Santa Cruz1
Solano1
Stanislaus1
Tulare1

Top cities

CityInstalls
Anderson2
Gilroy2
Lucerne2
Red Bluff2
Willows2
Applegate1
Arcata1
Bakersfield1
Coarsegold1
Concord1
Durham1
Eureka1
Grayson1
Hollister1
Manton1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Big Star Builders31
BIG STAR BUILDERS INC2
Big Star Builders Inc1

Common questions

Where does Big Star Builders install solar?

Its installs are spread across 24 counties. The most are in Contra Costa County (3 installs), followed by Santa Clara County (3).

How often does Big Star Builders install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Big Star Builders installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.