Arcadia Solar LLC

How many solar installs has Arcadia Solar LLC done in California, and which license number is on its installs?

Arcadia Solar LLC has 367 residential solar installs interconnected in California, active in the records from 2017 through 2024 (May 18, 2017 to Feb 8, 2024), most of them in Fresno County (154), Kern County (99) and Madera County (41). The license number recorded on most of its installs, 1012172, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
367
Last 24 months
0
Total capacity
2,683.5 kW DC
Median system size
6.7 kW DC
With battery storage
0.5% all time; no installs in the last 24 months last 24 months
Third-party owned
52.3% of 367 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Feb 6, 2024
Ownership types recorded
PPA 191, lease 1
Median battery size
9.9 kWh (2 installs list a capacity)
First install
May 18, 2017
Latest install
Feb 8, 2024
Counties
11
Utilities
PGE 303, SCE 64
CSLB license
1012172

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017590
2018990
2019480
202080
202110
202200
20231381
2024141
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 367 interconnected installs (1.9% of the 367 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.3% of those include battery storage. The latest Net Billing Tariff install was approved Feb 6, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.071.9%not counted
NEM 2.035396.2%1 (0.3%)
Net Billing Tariff71.9%1 (14.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 192 of Arcadia Solar LLC’s installs the utility recorded a third-party ownership type: PPA 191, lease 1, prepaid lease 0, other 0. Across all installers, 17 residential systems list a third-party owner name that matches Arcadia Solar LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Spruce Finance Inc68
SunRun Inc51
Sun Run Inc.34
Sunnova21
Arcadia Solar17

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 347 of Arcadia Solar LLC’s 367 installs name a module maker in the “Generator Manufacturer” fields, and most of those (274, 79.0%) used modules recorded as Qcells.

Across all years, 367 of Arcadia Solar LLC’s 367 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (314, 85.6%) used inverters recorded as SolarEdge.

Across all years, 2 of Arcadia Solar LLC’s 367 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as LG.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0274
LONGi064
LG03
SunPower03
Canadian Solar02
Inverter makerSolarEdge0314
Enphase048
Power-One04
SunPower04
Fronius03
Battery makerLG01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 347 of 367 installs, inverters on 367. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1012172Not found in the CSLB License Master file pulled Nov 4, 2026365

License numbers are the ones the utilities recorded on the interconnection applications (366 of 367 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno154
Kern99
Madera41
San Bernardino40
Tulare10
Kings8
Riverside8
Merced4
Los Angeles1
Stanislaus1
Ventura1

Top cities

CityInstalls
Fresno103
Bakersfield74
Madera39
Ontario24
Clovis18
Sanger16
Mc Farland10
Wasco9
Chino6
Fowler6
Jurupa Valley5
Kerman5
Lemoore5
Delano4
Selma4

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Arcadia Solar LLC196
ARCADIA SOLAR LLC169
Arcadia Solar1
Arcadia Solar LLc1

Common questions

Where does Arcadia Solar LLC install solar?

Its installs are spread across 11 counties. The most are in Fresno County (154 installs), followed by Kern County (99).

How often does Arcadia Solar LLC install batteries with solar?

0.5% of its interconnected solar installs include battery storage across all years.

How many Arcadia Solar LLC installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 367 interconnected installs (1.9% of the 367 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.