ACDC POWER

How many solar installs has ACDC POWER done in California, and which license number is on its installs?

ACDC POWER has 72 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jun 18, 2024 to Aug 26, 2026), most of them in Santa Clara County (25), Contra Costa County (14) and Santa Cruz County (11). CSLB lists license 1100968 (ACDC POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
72
Last 24 months
65
Total capacity
434.3 kW DC
Median system size
4.9 kW DC
With battery storage
69.4% all time; 66.2% last 24 months
Third-party owned
31.9% of 72 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
71 installs, latest Aug 26, 2026
Ownership types recorded
PPA 21, lease 1, other 1
Median battery size
1 kWh (17 installs list a capacity)
First install
Jun 18, 2024
Latest install
Aug 26, 2026
Counties
12
Utilities
PGE 69, SCE 3
CSLB license
1100968

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241717
20251714
2026 (through Aug 31, 2026)3819

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

71 of its 72 interconnected installs (98.6% of the 72 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011.4%0 (0.0%)
Net Billing Tariff7198.6%50 (70.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 23 of ACDC POWER’s installs the utility recorded a third-party ownership type: PPA 21, lease 1, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches ACDC POWER exactly.

Third-party owner named on its installsInstalls
EverBright17
Concert Finance2
GOODLEAP2
CONCERT1
EverBrigh1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 62 of ACDC POWER’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (22, 35.5%) used modules recorded as JA Solar.

In the last 24 months, 65 of ACDC POWER’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 72.3%) used inverters recorded as Enphase.

In the last 24 months, 39 of ACDC POWER’s 65 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (23, 59.0%) used batteries recorded as Enphase.

45 of 50 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar2222
LONGi2222
Qcells1314
REC56
Canadian Solar15
Inverter makerEnphase4754
Tesla1920
SolarEdge11
Battery makerEnphase2329
Tesla1616

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 68 of 72 installs, inverters on 72. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1100968ACDC POWER (Corporation)CLEARC-10 Electrical ContractorJan 30, 2023Jan 31, 202772

License numbers are the ones the utilities recorded on the interconnection applications (72 of 72 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1100968. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara25
Contra Costa14
Santa Cruz11
San Joaquin6
San Mateo6
Alameda2
San Benito2
Ventura2
El Dorado1
Los Angeles1
Merced1
Solano1

Top cities

CityInstalls
San Jose21
Manteca4
Santa Cruz4
Antioch3
Aptos2
Boulder Creek2
Concord2
Hollister2
Los Gatos2
Oakley2
Redwood City2
San Ramon2
Watsonville2
Alamo1
Brentwood1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ACDC POWER72

Common questions

Where does ACDC POWER install solar?

Its installs are spread across 12 counties. The most are in Santa Clara County (25 installs), followed by Contra Costa County (14).

How often does ACDC POWER install batteries with solar?

69.4% of its interconnected solar installs include battery storage across all years, and 66.2% in the last 24 months (43 of 65).

How many ACDC POWER installs are under NEM 3.0 (the Net Billing Tariff)?

71 of its 72 interconnected installs (98.6% of the 72 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.