URBAN DESIGN

How many solar installs has URBAN DESIGN done in California, and which license number is on its installs?

URBAN DESIGN has 521 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Oct 20, 2015 to Aug 24, 2026), most of them in Butte County (491), Tehama County (9) and Glenn County (5). CSLB lists license 893826 (URBAN DESIGN) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-36, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
521
Last 24 months
134
Total capacity
4,417.9 kW DC
Median system size
7.8 kW DC
With battery storage
18.0% all time; 58.2% last 24 months
Third-party owned
0.2% of 521 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
140 installs, latest Aug 24, 2026
Ownership types recorded
PPA 1
Median battery size
13.5 kWh (31 installs list a capacity)
First install
Oct 20, 2015
Latest install
Aug 24, 2026
Counties
13
Utilities
PGE 521
CSLB license
893826

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201520
201600
201700
201800
201900
202000
2021200
20221402
20231684
20248119
20258146
2026 (through Aug 31, 2026)2923

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

140 of its 521 interconnected installs (26.9% of the 521 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.040.8%not counted
NEM 2.037772.4%9 (2.4%)
Net Billing Tariff14026.9%85 (60.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of URBAN DESIGN’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches URBAN DESIGN exactly.

Third-party owner named on its installsInstalls
Palmetto Solar LLC.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 131 of URBAN DESIGN’s 134 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (61, 46.6%) used modules recorded as LONGi.

In the last 24 months, 134 of URBAN DESIGN’s 134 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (96, 71.6%) used inverters recorded as Enphase.

In the last 24 months, 75 of URBAN DESIGN’s 134 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (37, 49.3%) used batteries recorded as Enphase.

90 of 94 battery-paired PG&E and SCE installs (95.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi6161
Qcells56349
Canadian Solar1064
Mission Solar66
CertainTeed2not in top list
Inverter makerEnphase96471
Tesla2731
PointGuard Energy Inc.99
Sigenergy3not in top list
Fronius2not in top list
Battery makerEnphase3748
Tesla2731
PointGuard Energy Inc.88
Sigenergy22
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 485 of 521 installs, inverters on 521. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names URBAN DESIGN as developer on 0 battery storage projects and as installer on 4 (0 name it as both), 4 projects in all with 53 kWh of storage. 3 have the status Paid, with $34,087 in current incentive allocations. Applications were received from Nov 17, 2025 to Dec 18, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid334$34,087
Pending Reservation119$18,786

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency453$52,8733$34,087

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
893826URBAN DESIGN (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorApr 4, 2007Apr 30, 2027521

License numbers are the ones the utilities recorded on the interconnection applications (521 of 521 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 893826. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte491
Tehama9
Glenn5
Contra Costa3
Nevada3
Shasta2
Yuba2
Colusa1
Mendocino1
Napa1
Placer1
Plumas1
Solano1

Top cities

CityInstalls
Paradise213
Chico185
Oroville43
Magalia34
Forest Ranch7
Durham6
Orland4
Corning3
Red Bluff3
Penn Valley2
Willows2
Anderson1
Angwin1
Berry Creek1
Brownsville1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
URBAN DESIGN512
Urban Design9

Common questions

Where does URBAN DESIGN install solar?

Its installs are spread across 13 counties. The most are in Butte County (491 installs), followed by Tehama County (9).

How often does URBAN DESIGN install batteries with solar?

18.0% of its interconnected solar installs include battery storage across all years, and 58.2% in the last 24 months (78 of 134).

How many URBAN DESIGN installs are under NEM 3.0 (the Net Billing Tariff)?

140 of its 521 interconnected installs (26.9% of the 521 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.