BLM HOLDINGS INC

How many solar installs has BLM HOLDINGS INC done in California, and which license number is on its installs?

BLM HOLDINGS INC has 260 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 28, 2019 to May 7, 2026), most of them in Butte County (254), Tehama County (3) and Glenn County (2). CSLB lists license 927742 (BLM HOLDINGS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
260
Last 24 months
52
Total capacity
1,090.9 kW DC
Median system size
3 kW DC
With battery storage
0.8% all time; 0.0% last 24 months
Third-party owned
0.0% of 260 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Mar 6, 2026
Ownership types recorded
none recorded
First install
Oct 28, 2019
Latest install
May 7, 2026
Counties
4
Utilities
PGE 260
CSLB license
927742

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
2020130
2021370
2022550
2023510
2024692
2025260
2026 (through Aug 31, 2026)60

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 260 interconnected installs (2.7% of the 260 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.025397.3%2 (0.8%)
Net Billing Tariff72.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BLM HOLDINGS INC’s installs. No residential system in the file lists a third-party owner name that matches BLM HOLDINGS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 52 of BLM HOLDINGS INC’s 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 75.0%) used modules recorded as Qcells.

In the last 24 months, 52 of BLM HOLDINGS INC’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of BLM HOLDINGS INC’s 52 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells39219
JinkoSolar1336
Inverter makerEnphase52260
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 259 of 260 installs, inverters on 260. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
927742BLM HOLDINGS INC (Corporation)CLEARC-10 Electrical ContractorJan 22, 2009Oct 31, 2028260

License numbers are the ones the utilities recorded on the interconnection applications (260 of 260 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 927742. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte254
Tehama3
Glenn2
Napa1

Top cities

CityInstalls
Chico230
Paradise11
Durham8
Oroville4
Orland2
Cottonwood1
Gerber1
Los Molinos1
Magalia1
Napa1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BLM HOLDINGS INC260

Common questions

Where does BLM HOLDINGS INC install solar?

Its installs are spread across 4 counties. The most are in Butte County (254 installs), followed by Tehama County (3).

How often does BLM HOLDINGS INC install batteries with solar?

0.8% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 52).

How many BLM HOLDINGS INC installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 260 interconnected installs (2.7% of the 260 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.