Sunuso Energy

How many solar installs has Sunuso Energy done in California, and which license number is on its installs?

Sunuso Energy has 148 residential solar installs interconnected in California, active in the records from 2019 through 2024 (Apr 29, 2019 to Feb 8, 2024), most of them in Kern County (60), Los Angeles County (38) and Kings County (14). The license number recorded on most of its installs, 976259, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
148
Last 24 months
0
Total capacity
1,100.9 kW DC
Median system size
7 kW DC
With battery storage
0.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 148 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Feb 8, 2024
Ownership types recorded
none recorded
Median battery size
10.5 kWh (1 installs list a capacity)
First install
Apr 29, 2019
Latest install
Feb 8, 2024
Counties
14
Utilities
SCE 74, PGE 73, SDGE 1
CSLB license
976259

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019190
2020280
2021240
2022410
2023350
202411
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 148 interconnected installs (1.4% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 8, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.014698.6%0 (0.0%)
Net Billing Tariff21.4%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sunuso Energy’s installs. No residential system in the file lists a third-party owner name that matches Sunuso Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 148 of Sunuso Energy’s 148 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (30, 20.3%) used modules recorded as SolarEver Technologia.

Across all years, 148 of Sunuso Energy’s 148 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (83, 56.1%) used inverters recorded as SolarEdge.

Across all years, 1 of Sunuso Energy’s 148 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarEver Technologia030
Silfab025
Wuxi Suntech Power020
Qcells013
SolarEver Technolgia010
Inverter makerSolarEdge083
Enphase043
SunPower013
Tesla03
Delta Electronics02
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 148 of 148 installs, inverters on 148. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
976259Not found in the CSLB License Master file pulled Nov 4, 2026148

License numbers are the ones the utilities recorded on the interconnection applications (148 of 148 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Kern60
Los Angeles38
Kings14
San Bernardino14
Riverside7
Santa Clara3
Tulare3
Alameda2
Ventura2
Fresno1
Orange1
San Diego1
Santa Barbara1
Stanislaus1

Top cities

CityInstalls
Bakersfield39
Palmdale18
Corcoran7
Lancaster6
Arvin4
Hanford4
Corona3
Hesperia3
Lamont3
Shafter3
Apple Valley2
Fellows2
Lemoore2
Long Beach2
Los Angeles2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNUSO ENERGY107
Sunuso Energy41

Common questions

Where does Sunuso Energy install solar?

Its installs are spread across 14 counties. The most are in Kern County (60 installs), followed by Los Angeles County (38).

How often does Sunuso Energy install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sunuso Energy installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 148 interconnected installs (1.4% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.