Solarscape Artistry

How many solar installs has Solarscape Artistry done in California, and which license number is on its installs?

Solarscape Artistry has 360 residential solar installs interconnected in California, active in the records from 2010 through 2025 (Jun 10, 2010 to Dec 26, 2025), most of them in San Diego County (350), Orange County (8) and Riverside County (1). The license number recorded on most of its installs, 944107, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1064823 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028, recorded on 119 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Solarscape Artistry here carry more than one CSLB license number: 944107 on 142 (not found in the CSLB License Master file) and 1064823 on 119 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
360
Last 24 months
8
Total capacity
3,068.8 kW DC
Median system size
7.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 307 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Dec 26, 2025
Ownership types recorded
none recorded
First install
Jun 10, 2010
Latest install
Dec 26, 2025
Counties
4
Utilities
SDGE 358, SCE 2
CSLB license
944107, 1064823

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201060
201150
201200
2013150
2014220
2015330
2016390
2017310
2018310
2019460
2020280
2021240
2022290
2023390
202450
202570
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 360 interconnected installs (3.1% of the 360 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Dec 26, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011231.1%not counted
NEM 2.023765.8%0 (0.0%)
Net Billing Tariff113.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solarscape Artistry’s installs. No residential system in the file lists a third-party owner name that matches Solarscape Artistry exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of Solarscape Artistry’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 62.5%) used modules recorded as REC.

In the last 24 months, 8 of Solarscape Artistry’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 87.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC568
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.33
Inverter makerEnphase7346
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 347 of 360 installs, inverters on 358. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944107Not found in the CSLB License Master file pulled Nov 4, 2026142
1064823Sole owner license (name not shown)CLEARC-10 Electrical ContractorApr 1, 2020Apr 30, 2028119

License numbers are the ones the utilities recorded on the interconnection applications (261 of 360 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1064823. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solarscape Artistry’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020Total
unincorporated San Diego County944107107118

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego350
Orange8
Riverside1
San Bernardino1

Top cities

CityInstalls
San Diego115
Carlsbad32
Rancho Santa Fe29
La Jolla28
Solana Beach23
Poway21
Del Mar20
Encinitas18
El Cajon11
Vista7
Bonita6
Chula Vista6
Coronado6
Oceanside5
La Mesa4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solarscape Artistry358
SOLARSCAPE ARTISTRY INC2

Common questions

Where does Solarscape Artistry install solar?

Its installs are spread across 4 counties. The most are in San Diego County (350 installs), followed by Orange County (8).

How often does Solarscape Artistry install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solarscape Artistry installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 360 interconnected installs (3.1% of the 360 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.