Sass Electric

How many solar installs has Sass Electric done in California, and which license number is on its installs?

Sass Electric has 157 residential solar installs interconnected in California, active in the records from 2011 through 2025 (Aug 22, 2011 to Feb 19, 2025), most of them in San Diego County (109), Orange County (42) and Riverside County (5). CSLB lists license 911451 (GO GREEN POWER SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
157
Last 24 months
2
Total capacity
1,160.6 kW DC
Median system size
6.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.9% of 113 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Feb 19, 2025
Ownership types recorded
PPA 1
First install
Aug 22, 2011
Latest install
Feb 19, 2025
Counties
4
Utilities
SDGE 150, SCE 7
CSLB license
911451

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201250
2013150
2014150
2015210
2016350
2017100
2018330
2019130
202040
202120
202210
202300
202400
202520
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 157 interconnected installs (1.3% of the 157 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Feb 19, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08151.6%not counted
NEM 2.07447.1%0 (0.0%)
Net Billing Tariff21.3%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Sass Electric’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sass Electric exactly.

Third-party owner named on its installsInstalls
BANK1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Sass Electric’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of Sass Electric’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as APsystems (Altenergy Power System).

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2not in top list
Inverter makerAPsystems (Altenergy Power System)22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 147 of 157 installs, inverters on 151. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
911451GO GREEN POWER SYSTEMS (Corporation)CLEARC-10 Electrical ContractorFeb 28, 2008Feb 29, 202880

License numbers are the ones the utilities recorded on the interconnection applications (88 of 157 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 911451. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sass Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182021Total
unincorporated San Diego County911451325

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego109
Orange42
Riverside5
San Bernardino1

Top cities

CityInstalls
Lakeside44
Ramona40
San Diego20
El Cajon12
Poway5
Fallbrook4
Spring Valley4
Escondido3
La Mesa3
Carlsbad2
Chula Vista2
Julian2
Menifee2
Alpine1
Borrego Springs1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sass Electric102
sass electric44
Sass Electric Inc4
SASS ELECTRIC3
Sass electric2
SASS ELECTRIC INC2

Common questions

Where does Sass Electric install solar?

Its installs are spread across 4 counties. The most are in San Diego County (109 installs), followed by Orange County (42).

How often does Sass Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sass Electric installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 157 interconnected installs (1.3% of the 157 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.