RC Energy Solutions

How many solar installs has RC Energy Solutions done in California, and which license number is on its installs?

RC Energy Solutions has 205 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Nov 25, 2015 to Apr 24, 2026), most of them in San Diego County (192), Riverside County (8) and Orange County (5). CSLB lists license 989442 (MY RC HOME) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
205
Last 24 months
8
Total capacity
1,221.6 kW DC
Median system size
5.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 205 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Apr 14, 2026
Ownership types recorded
none recorded
First install
Nov 25, 2015
Latest install
Apr 24, 2026
Counties
3
Utilities
SDGE 196, SCE 9
CSLB license
989442

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201560
2016540
2017360
2018210
2019280
2020130
2021120
2022120
2023140
202420
202540
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 205 interconnected installs (2.9% of the 205 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Apr 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04421.5%not counted
NEM 2.015575.6%0 (0.0%)
Net Billing Tariff62.9%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RC Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches RC Energy Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of RC Energy Solutions’ 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used modules recorded as REC.

In the last 24 months, 8 of RC Energy Solutions’ 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 62.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC519
Silfab133
Inverter makerEnphase545
Tesla33
ABB11
Power-One1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 193 of 205 installs, inverters on 205. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
989442MY RC HOME (Corporation)CLEARB General Building ContractorDec 31, 2013Dec 31, 2027177

License numbers are the ones the utilities recorded on the interconnection applications (180 of 205 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 989442. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list RC Energy Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192022Total
unincorporated San Diego County98944264111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego192
Riverside8
Orange5

Top cities

CityInstalls
San Diego52
San Marcos29
Encinitas16
Vista15
Oceanside14
Carlsbad12
Escondido12
Fallbrook6
La Mesa6
Chula Vista5
La Jolla5
Lakeside4
Spring Valley4
Ramona3
Rancho Santa Fe3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RC Energy Solutions205

Common questions

Where does RC Energy Solutions install solar?

Its installs are spread across 3 counties. The most are in San Diego County (192 installs), followed by Riverside County (8).

How often does RC Energy Solutions install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many RC Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 205 interconnected installs (2.9% of the 205 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.