PV Guru

How many solar installs has PV Guru done in California, and which license number is on its installs?

PV Guru has 58 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Dec 3, 2014 to Jul 10, 2025), most of them in Los Angeles County (21), Ventura County (10) and Santa Clara County (8). CSLB lists license 983373 (PV GURU INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
1
Total capacity
363.9 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.8% of 57 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jul 10, 2025
Ownership types recorded
lease 1
First install
Dec 3, 2014
Latest install
Jul 10, 2025
Counties
9
Utilities
SCE 42, PGE 12, SDGE 4
CSLB license
983373

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
2015270
2016240
201740
201810
201900
202000
202100
202200
202300
202400
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 58 interconnected installs (1.7% of the 58 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 10, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05696.6%not counted
NEM 2.011.7%not recorded
Net Billing Tariff11.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of PV Guru’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PV Guru exactly.

Third-party owner named on its installsInstalls
PCS Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of PV Guru’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Trina Solar.

In the last 24 months, 1 of PV Guru’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar1not in top list
Inverter makerSolarEdge130

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 56 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
983373PV GURU INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorMay 1, 2013May 31, 202719

License numbers are the ones the utilities recorded on the interconnection applications (19 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 983373. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PV Guru’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County98337311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles21
Ventura10
Santa Clara8
Orange6
San Bernardino4
Alameda3
Riverside3
San Diego2
Contra Costa1

Top cities

CityInstalls
Valencia6
San Jose5
Simi Valley4
Whittier4
Agoura Hills3
Cerritos3
Alta Loma2
Fremont2
Oak Park2
Thousand Oaks2
Albany1
Altadena1
Blythe1
Corona1
Cupertino1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PV Guru35
PV Guru, Inc.11
PV Guru Inc8
PV GURU INC.2
PV GURU INC1
PV Guru Inc.1

Common questions

Where does PV Guru install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (21 installs), followed by Ventura County (10).

How often does PV Guru install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PV Guru installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 58 interconnected installs (1.7% of the 58 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.