Precision Solar

How many solar installs has Precision Solar done in California, and which license number is on its installs?

Precision Solar has 131 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Apr 29, 2013 to Feb 2, 2026), most of them in San Diego County (114), Riverside County (9) and Orange County (5). CSLB lists license 921105 (PRECISION SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
131
Last 24 months
3
Total capacity
994.8 kW DC
Median system size
7.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Feb 2, 2026
Ownership types recorded
none recorded
First install
Apr 29, 2013
Latest install
Feb 2, 2026
Counties
6
Utilities
SDGE 118, SCE 12, PGE 1
CSLB license
921105

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013120
2014150
2015190
2016220
201760
201840
2019100
202090
202170
202280
2023110
202450
202520
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 131 interconnected installs (4.6% of the 131 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Feb 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05743.5%not counted
NEM 2.06851.9%0 (0.0%)
Net Billing Tariff64.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Precision Solar’s installs. No residential system in the file lists a third-party owner name that matches Precision Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Precision Solar’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Silfab.

In the last 24 months, 3 of Precision Solar’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 33.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab219
Qcells14
Inverter makerEnphase135
SolarEdge159
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 121 of 131 installs, inverters on 131. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
921105PRECISION SOLAR INC (Corporation)CLEARC-46 Solar ContractorAug 20, 2008Oct 31, 202883

License numbers are the ones the utilities recorded on the interconnection applications (84 of 131 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 921105. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Precision Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232025Total
unincorporated San Diego County921105233221114

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego114
Riverside9
Orange5
Los Angeles1
San Bernardino1
San Luis Obispo1

Top cities

CityInstalls
San Diego23
Escondido18
Carlsbad11
Encinitas11
San Marcos9
Vista9
Oceanside6
Rancho Santa Fe6
Del Mar3
Temecula3
Valley Center3
Borrego Springs2
La Mesa2
Murrieta2
Pala2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Precision Solar118
PRECISION SOLAR INC5
Precision Solar, Inc.5
PRECISION SOLAR2
Precision solar1

Common questions

Where does Precision Solar install solar?

Its installs are spread across 6 counties. The most are in San Diego County (114 installs), followed by Riverside County (9).

How often does Precision Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Precision Solar installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 131 interconnected installs (4.6% of the 131 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.