Open Energy has 84 residential solar installs interconnected in California, active in the records from 2007 through 2011 (Oct 31, 2007 to Apr 6, 2011), most of them in El Dorado County (37), San Diego County (23) and San Bernardino County (6). The utilities did not record a CSLB license number on enough of these installs to look one up.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 84
- Last 24 months
- 0
- Total capacity
- 191.3 kW DC
- Median system size
- 2.1 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 54 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Oct 31, 2007
- Latest install
- Apr 6, 2011
- Counties
- 12
- Utilities
- PGE 54, SDGE 23, SCE 7
- CSLB license
- none reported
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2007 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2007 | 13 | 0 |
| 2008 | 53 | 0 |
| 2009 | 11 | 0 |
| 2010 | 5 | 0 |
| 2011 | 2 | 0 |
| 2012 | 0 | 0 |
| 2013 | 0 | 0 |
| 2014 | 0 | 0 |
| 2015 | 0 | 0 |
| 2016 | 0 | 0 |
| 2017 | 0 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 84 interconnected installs with a tariff recorded (84) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 84 | 100.0% | not counted |
| NEM 2.0 | 0 | 0.0% | 0 |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Open Energy’s installs. No residential system in the file lists a third-party owner name that matches Open Energy exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 54 of Open Energy’s 84 installs name a module maker in the “Generator Manufacturer” fields, and most of those (53, 98.1%) used modules recorded as Open Energy Corporation.
Across all years, 84 of Open Energy’s 84 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 56.0%) used inverters recorded as PV Powered.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Open Energy Corporation | 0 | 53 |
| Connect Renewable Energy | 0 | 1 | |
| Inverter maker | PV Powered | 0 | 47 |
| Connect Renewable Energy | 0 | 21 | |
| Open Energy Corporation | 0 | 10 | |
| Advanced Energy, Inc. | 0 | 5 | |
| SMA | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 84 installs, inverters on 84. See the methodology and the equipment index.
Contractor license
The utilities did not record a license number for enough of these installs to look one up.
License numbers are the ones the utilities recorded on the interconnection applications (0 of 84 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.
Counties
| County | Installs |
|---|---|
| El Dorado | 37 |
| San Diego | 23 |
| San Bernardino | 6 |
| Yolo | 6 |
| Placer | 4 |
| Alameda | 2 |
| Fresno | 1 |
| Kern | 1 |
| Kings | 1 |
| San Joaquin | 1 |
| Tulare | 1 |
| Yuba | 1 |
Top cities
| City | Installs |
|---|---|
| El Dorado Hills | 37 |
| San Diego | 23 |
| Woodland | 6 |
| Fontana | 5 |
| Granite Bay | 2 |
| Castro Valley | 1 |
| Chino Hills | 1 |
| Fresno | 1 |
| Lathrop | 1 |
| Lemoore | 1 |
| Loomis | 1 |
| Marysville | 1 |
| Pleasanton | 1 |
| Rocklin | 1 |
| Taft | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Open Energy | 41 |
| Open Energy Corporation | 31 |
| OPEN ENERGY CORPORATION | 7 |
| Open Energy Corp. | 3 |
| Open Energy Corp | 1 |
| Open Energy, Inc. | 1 |
Common questions
Where does Open Energy install solar?
Its installs are spread across 12 counties. The most are in El Dorado County (37 installs), followed by San Diego County (23).
How often does Open Energy install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Open Energy installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 84 interconnected installs with a tariff recorded (84) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056