Kingdom Solar

How many solar installs has Kingdom Solar done in California, and which license number is on its installs?

Kingdom Solar has 526 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Oct 2, 2017 to Aug 17, 2026), most of them in Alameda County (270), Contra Costa County (158) and Santa Clara County (31). CSLB lists license 1028324 (KINGDOM SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
526
Last 24 months
47
Total capacity
3,555.2 kW DC
Median system size
6.2 kW DC
With battery storage
16.0% all time; 78.7% last 24 months
Third-party owned
0.0% of 526 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
60 installs, latest May 16, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (16 installs list a capacity)
First install
Oct 2, 2017
Latest install
Aug 17, 2026
Counties
13
Utilities
PGE 525, SCE 1
CSLB license
1028324

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201770
2018340
2019430
2020386
2021659
202211914
20231534
20242215
20253931
2026 (through Aug 31, 2026)65

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

60 of its 526 interconnected installs (11.4% of the 526 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.7% of those include battery storage. The latest Net Billing Tariff install was approved May 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.040.8%not counted
NEM 2.046287.8%33 (7.1%)
Net Billing Tariff6011.4%49 (81.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Kingdom Solar’s installs. No residential system in the file lists a third-party owner name that matches Kingdom Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 47 of Kingdom Solar’s 47 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 72.3%) used modules recorded as REC.

In the last 24 months, 47 of Kingdom Solar’s 47 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 89.4%) used inverters recorded as Enphase.

In the last 24 months, 35 of Kingdom Solar’s 47 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (20, 57.1%) used batteries recorded as FranklinWH.

78 of 84 battery-paired PG&E and SCE installs (92.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC3461
Qcells9277
Canadian Solar2not in top list
Waaree2not in top list
Mitsubishi Electric1not in top list
Inverter makerEnphase42318
FranklinWH2020
Tesla5not in top list
SMA312
SolarEdge1171
Battery makerFranklinWH2020
Enphase1029
Tesla44
LG15

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 498 of 526 installs, inverters on 526. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Kingdom Solar as developer on 5 battery storage projects and as installer on 5 (5 name it as both), 5 projects in all with 79 kWh of storage. 4 have the status Paid, with $11,149 in current incentive allocations. Applications were received from Jan 12, 2021 to Aug 25, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid465$11,149
Cancelled114$2,776

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage579$13,9244$11,149

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1028324KINGDOM SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJun 26, 2017Oct 31, 2027526

License numbers are the ones the utilities recorded on the interconnection applications (526 of 526 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1028324. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Kingdom Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
City and County of San Francisco102832411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda270
Contra Costa158
Santa Clara31
San Joaquin27
San Mateo8
Marin6
San Luis Obispo6
Solano5
San Francisco4
Santa Barbara4
Sonoma4
Napa2
Los Angeles1

Top cities

CityInstalls
Oakland119
Berkeley60
Livermore44
Antioch23
San Jose20
Danville18
Tracy17
San Ramon14
El Cerrito13
Walnut Creek11
Fremont9
Albany8
Stockton8
Moraga7
Pleasant Hill7

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KINGDOM SOLAR INC456
Kingdom Solar66
KINGDOM SOLAR4

Common questions

Where does Kingdom Solar install solar?

Its installs are spread across 13 counties. The most are in Alameda County (270 installs), followed by Contra Costa County (158).

How often does Kingdom Solar install batteries with solar?

16.0% of its interconnected solar installs include battery storage across all years, and 78.7% in the last 24 months (37 of 47).

How many Kingdom Solar installs are under NEM 3.0 (the Net Billing Tariff)?

60 of its 526 interconnected installs (11.4% of the 526 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.