TLP Electric
How many solar installs has TLP Electric done in California, and which license number is on its installs?
TLP Electric has 54 residential solar installs interconnected in California, active in the records from 2012 through 2018 (Jan 19, 2012 to Jun 5, 2018), most of them in Orange County (35), Los Angeles County (8) and Riverside County (7). CSLB lists license 824287 (INFINITY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 54
- Last 24 months
- 0
- Total capacity
- 372.2 kW DC
- Median system size
- 5.3 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 42.9% of 35 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 8, lease 7
- First install
- Jan 19, 2012
- Latest install
- Jun 5, 2018
- Counties
- 5
- Utilities
- SCE 54
- CSLB license
- 824287
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2012 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2012 | 7 | 0 |
| 2013 | 13 | 0 |
| 2014 | 9 | 0 |
| 2015 | 11 | 0 |
| 2016 | 0 | 0 |
| 2017 | 13 | 0 |
| 2018 | 1 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 40 | 74.1% | not counted |
| NEM 2.0 | 14 | 25.9% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 15 of TLP Electric’s installs the utility recorded a third-party ownership type: PPA 8, lease 7, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches TLP Electric exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| MYSOLAR 1, LLC | 5 |
| Kilowatt Systems, LLC | 4 |
| Greenday Finance I, LLC | 2 |
| PVHOME PPA 1, LLC | 2 |
| GREENDAY FINANCE 1 LLC | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 14 of TLP Electric’s 54 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 100.0%) used modules recorded as Panasonic.
Across all years, 54 of TLP Electric’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (36, 66.7%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Panasonic | 0 | 14 |
| Inverter maker | Enphase | 0 | 36 |
| SolarEdge | 0 | 12 | |
| SMA | 0 | 4 | |
| ABB | 0 | 1 | |
| Power-One | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 14 of 54 installs, inverters on 54. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 824287 | INFINITY SOLAR (Corporation) | CLEAR | C-10 Electrical Contractor | Sep 16, 2003 | Sep 30, 2027 | 54 |
License numbers are the ones the utilities recorded on the interconnection applications (54 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 824287. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list TLP Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2021 | Total |
|---|---|---|---|---|
| unincorporated San Diego County | 824287 | 3 | 1 | 4 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- INFINITY SOLAR: 920 installs, license 824287
- TLP Electric Integrations, Inc.: 918 installs, license 824287
- Infinity Electric: 528 installs, license 824287
- TLP Electric Integrations Inc. Infinity: 178 installs, license 824287
- TLP ELECTRICAL: 81 installs, license 824287
Counties
| County | Installs |
|---|---|
| Orange | 35 |
| Los Angeles | 8 |
| Riverside | 7 |
| San Bernardino | 3 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Irvine | 6 |
| Orange | 5 |
| Corona | 3 |
| Newport Beach | 3 |
| Yorba Linda | 3 |
| Cypress | 2 |
| Hemet | 2 |
| Trabuco Canyon | 2 |
| Aliso Viejo | 1 |
| Brea | 1 |
| Claremont | 1 |
| Coto de Caza | 1 |
| Culver City | 1 |
| Fountain Valley | 1 |
| Fullerton | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| TLP Electric | 39 |
| TLP ELECTRIC | 11 |
| TLP electric | 4 |
Common questions
Where does TLP Electric install solar?
Its installs are spread across 5 counties. The most are in Orange County (35 installs), followed by Los Angeles County (8).
How often does TLP Electric install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many TLP Electric installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.