Evolution Energy

How many solar installs has Evolution Energy done in California, and which license number is on its installs?

Evolution Energy has 514 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Jul 16, 2014 to Dec 26, 2025), most of them in San Diego County (142), Los Angeles County (131) and Riverside County (102). CSLB lists license 944493 (EVOLUTION ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
514
Last 24 months
2
Total capacity
3,324.8 kW DC
Median system size
5.9 kW DC
With battery storage
4.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 449 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Dec 26, 2025
Ownership types recorded
none recorded
Median battery size
10.8 kWh (17 installs list a capacity)
First install
Jul 16, 2014
Latest install
Dec 26, 2025
Counties
7
Utilities
SCE 349, SDGE 163, PGE 2
CSLB license
944493

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014330
2015881
2016880
2017892
2018662
2019643
2020290
2021408
2022121
202310
202420
202520
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 514 interconnected installs (0.8% of the 514 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Dec 26, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022944.6%not counted
NEM 2.028154.7%15 (11.9%)
Net Billing Tariff40.8%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Evolution Energy’s installs. No residential system in the file lists a third-party owner name that matches Evolution Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Evolution Energy’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as REC.

In the last 24 months, 2 of Evolution Energy’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Evolution Energy’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

13 of 17 battery-paired PG&E and SCE installs (76.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC266
Inverter makerEnphase263
Battery makerGenerac06
LG04
Enphase03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 452 of 514 installs, inverters on 514. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Evolution Energy as developer on 138 battery storage projects and as installer on 138 (138 name it as both), 138 projects in all with 2,055 kWh of storage. 73 have the status Paid, with $164,743 in current incentive allocations. Applications were received from May 7, 2018 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid73992$164,743
Reserved17284$40,101
Pending Reservation4144$16,920
Cancelled34499$105,462
RRF Rejected10136$24,254

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1211,766$275,46271$153,468
Large-Scale Storage6127$30,0292$11,275
Equity Resiliency126$21,7360$0
Not stated10136$24,2540$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944493EVOLUTION ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMar 17, 2010Aug 31, 2028478

License numbers are the ones the utilities recorded on the interconnection applications (479 of 514 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 944493. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Evolution Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County9444939772126

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego142
Los Angeles131
Riverside102
San Bernardino90
Orange46
Santa Clara2
Ventura1

Top cities

CityInstalls
San Diego39
Blythe18
Corona18
Riverside18
El Cajon14
Chula Vista13
Mira Loma13
Rialto13
Downey12
Fontana11
San Bernardino11
Oceanside9
Palmdale9
Pomona9
San Juan Capo9

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Evolution Energy276
EVOLUTION ENERGY238

Common questions

Where does Evolution Energy install solar?

Its installs are spread across 7 counties. The most are in San Diego County (142 installs), followed by Los Angeles County (131).

How often does Evolution Energy install batteries with solar?

4.8% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Evolution Energy installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 514 interconnected installs (0.8% of the 514 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.