How many solar installs has Efficient Energy Concepts done in California, and which license number is on its installs?

Efficient Energy Concepts has 72 residential solar installs interconnected in California, active in the records from 2010 through 2020 (Jul 16, 2010 to Apr 27, 2020), most of them in Butte County (38), Tehama County (10) and Glenn County (7). The license number recorded on most of its installs, 694655, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
72
Last 24 months
0
Total capacity
475.1 kW DC
Median system size
6.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 72 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 16, 2010
Latest install
Apr 27, 2020
Counties
14
Utilities
PGE 72
CSLB license
694655

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201040
201120
201270
201350
2014190
201560
201610
201740
201860
2019100
202080
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 72 interconnected installs with a tariff recorded (72) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04461.1%not counted
NEM 2.02838.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Efficient Energy Concepts’s installs. No residential system in the file lists a third-party owner name that matches Efficient Energy Concepts exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 71 of Efficient Energy Concepts’ 72 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 28.2%) used modules recorded as Light Way Green New Energy.

Across all years, 72 of Efficient Energy Concepts’ 72 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 37.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLight Way Green New Energy020
JinkoSolar015
SolarWorld011
Canadian Solar010
Qcells08
Inverter makerEnphase027
APsystems (Altenergy Power System)026
SolarEdge019

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 71 of 72 installs, inverters on 72. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
694655Not found in the CSLB License Master file pulled Nov 4, 202649

License numbers are the ones the utilities recorded on the interconnection applications (49 of 72 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Butte38
Tehama10
Glenn7
Sutter4
Solano3
Amador2
Colusa1
El Dorado1
Lake1
Mendocino1
Merced1
Nevada1
Sonoma1
Yuba1

Top cities

CityInstalls
Chico28
Red Bluff6
Orland4
Yuba City4
Oroville3
Paradise3
Willows3
Durham2
Fairfield2
Cameron Park1
Flournoy1
Fort Bragg1
Gerber1
Grass Valley1
Ione1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Efficient Energy Concepts26
Efficient Energy Concepts, Inc.18
EFFICIENT ENERGY CONCEPTS INC12
Efficient Energy Concepts Inc.11
EFFICIENT ENERGY CONCEPTS, INC.2
efficient energy concepts1
EFFICIENT ENERGY CONCEPTS1
Efficient Energy Concepts, Inc1

Common questions

Where does Efficient Energy Concepts install solar?

Its installs are spread across 14 counties. The most are in Butte County (38 installs), followed by Tehama County (10).

How often does Efficient Energy Concepts install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Efficient Energy Concepts installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 72 interconnected installs with a tariff recorded (72) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.