Desert Solar

How many solar installs has Desert Solar done in California, and which license number is on its installs?

Desert Solar has 237 residential solar installs interconnected in California, active in the records from 2008 through 2021 (Jul 10, 2008 to Feb 17, 2021), most of them in San Bernardino County (167), Riverside County (27) and Kern County (19). The license number recorded on most of its installs, 942290, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 845653 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028, recorded on 35 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Desert Solar here carry more than one CSLB license number: 942290 on 193 (not found in the CSLB License Master file) and 845653 on 35 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
237
Last 24 months
0
Total capacity
1,508 kW DC
Median system size
5.4 kW DC
With battery storage
0.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
8.0% of 175 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 12, other 2
Median battery size
11 kWh (2 installs list a capacity)
First install
Jul 10, 2008
Latest install
Feb 17, 2021
Counties
9
Utilities
SCE 211, PGE 18, SDGE 8
CSLB license
942290, 845653

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200810
200910
2010120
2011250
2012190
2013300
2014450
2015550
2016211
2017100
201870
201980
202020
202111
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 237 interconnected installs with a tariff recorded (237) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021791.6%not counted
NEM 2.0208.4%1 (5.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 14 of Desert Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 12, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Desert Solar exactly.

Third-party owner named on its installsInstalls
V's Solar Enterprise LLC7
SunPower Capital, LLC4
Sunnova2
Fernandez, Jesus1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 76 of Desert Solar’s 237 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (36, 47.4%) used modules recorded as Canadian Solar.

Across all years, 236 of Desert Solar’s 237 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (97, 41.1%) used inverters recorded as SolarEdge.

0 of 2 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar036
Seraphim014
Qcells07
Talesun Solar05
ET Solar Industry, Ltd.03
Inverter makerSolarEdge097
SMA074
ABB026
Fronius012
Advanced Energy, Inc.07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 76 of 237 installs, inverters on 236. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
942290Not found in the CSLB License Master file pulled Nov 4, 2026193
845653Sole owner license (name not shown)CLEARC-10 Electrical ContractorAug 31, 2004Aug 31, 202835

License numbers are the ones the utilities recorded on the interconnection applications (229 of 237 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 845653. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino167
Riverside27
Kern19
Los Angeles9
San Diego8
Orange4
San Joaquin1
San Luis Obispo1
Ventura1

Top cities

CityInstalls
Apple Valley89
Victorville21
Hesperia16
Bakersfield12
Oak Hills7
Phelan7
Rancho Mirage6
Adelanto5
Palm Desert5
Palmdale5
Cathedral City4
Lucerne Valley4
Arvin3
Ontario3
Palm Springs3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DESERT SOLAR INC70
Desert Solar56
DESERT SOLAR47
Desert Solar Inc39
Desert Solar Inc dba DS Energy Solutions17
desert solar inc8

Common questions

Where does Desert Solar install solar?

Its installs are spread across 9 counties. The most are in San Bernardino County (167 installs), followed by Riverside County (27).

How often does Desert Solar install batteries with solar?

0.9% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Desert Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 237 interconnected installs with a tariff recorded (237) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.