How many solar installs has BRIGHT SPOT SOLAR done in California, and which license number is on its installs?

BRIGHT SPOT SOLAR has 81 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Aug 2, 2021 to Aug 31, 2026), most of them in Los Angeles County (45), Orange County (22) and San Bernardino County (8). CSLB lists license 1007552 (BRIGHT SPOT SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
81
Last 24 months
28
Total capacity
615.6 kW DC
Median system size
6.4 kW DC
With battery storage
9.9% all time; 25.0% last 24 months
Third-party owned
2.5% of 81 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
25 installs, latest Aug 31, 2026
Ownership types recorded
other 2
Median battery size
18.7 kWh (8 installs list a capacity)
First install
Aug 2, 2021
Latest install
Aug 31, 2026
Counties
7
Utilities
SCE 79, PGE 2
CSLB license
1007552

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202180
2022191
2023230
202461
2025142
2026 (through Aug 31, 2026)114

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

25 of its 81 interconnected installs (30.9% of the 81 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 28.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05669.1%1 (1.8%)
Net Billing Tariff2530.9%7 (28.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of BRIGHT SPOT SOLAR’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches BRIGHT SPOT SOLAR exactly.

Third-party owner named on its installsInstalls
MICHELLE LAW1
Property Owner1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of BRIGHT SPOT SOLAR’s 28 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 25.9%) used modules recorded as Aptos Solar.

In the last 24 months, 28 of BRIGHT SPOT SOLAR’s 28 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 82.1%) used inverters recorded as Enphase.

In the last 24 months, 7 of BRIGHT SPOT SOLAR’s 28 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (3, 42.9%) used batteries recorded as Enphase.

7 of 8 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar77
LONGi46
United Renewable Energy422
Hyundai3not in top list
Qcells318
Inverter makerEnphase2346
SolarEdge223
Phasegreen Technology1not in top list
Sigenergy1not in top list
Tesla1not in top list
Battery makerEnphase33
Phasegreen Technology11
Sigenergy11
SolarEdge11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 71 of 81 installs, inverters on 81. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names BRIGHT SPOT SOLAR as developer on 0 battery storage projects and as installer on 10 (0 name it as both), 10 projects in all with 657 kWh of storage. 3 have the status Paid, with $7,484 in current incentive allocations. Applications were received from Sep 1, 2020 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid353$7,484
PBI in Process1473$118,174
Reserved4111$12,147
RRF Rejected220$3,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage7164$19,6313$7,484
Large-Scale Storage1473$118,1740$0
Not stated220$3,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1007552BRIGHT SPOT SOLAR (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorSep 22, 2015Sep 30, 202781

License numbers are the ones the utilities recorded on the interconnection applications (81 of 81 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1007552. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles45
Orange22
San Bernardino8
Riverside3
Merced1
Santa Clara1
Ventura1

Top cities

CityInstalls
Monrovia9
Santa Ana9
Irvine8
Arcadia7
Ontario5
Temple City5
San Gabriel4
Rosemead3
Chino2
Diamond Bar2
Montebello2
Riverside2
Walnut2
Yorba Linda2
Alhambra1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT SPOT SOLAR81

Common questions

Where does BRIGHT SPOT SOLAR install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (45 installs), followed by Orange County (22).

How often does BRIGHT SPOT SOLAR install batteries with solar?

9.9% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (7 of 28).

How many BRIGHT SPOT SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

25 of its 81 interconnected installs (30.9% of the 81 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 28.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.