Bedrock Solar

How many solar installs has Bedrock Solar done in California, and which license number is on its installs?

Bedrock Solar has 322 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Sep 18, 2012 to Jul 27, 2026), most of them in Orange County (194), San Diego County (121) and Riverside County (6). CSLB lists license 1011093 (BEDROCK SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
322
Last 24 months
29
Total capacity
2,018.6 kW DC
Median system size
5.6 kW DC
With battery storage
9.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 290 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
32 installs, latest Jul 27, 2026
Ownership types recorded
none recorded
Median battery size
14 kWh (1 installs list a capacity)
First install
Sep 18, 2012
Latest install
Jul 27, 2026
Counties
4
Utilities
SDGE 311, SCE 11
CSLB license
1011093

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
2013130
2014100
2015250
2016250
2017140
201890
2019120
2020200
2021310
2022461
2023710
2024180
2025190
2026 (through Aug 31, 2026)70

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

32 of its 322 interconnected installs (9.9% of the 322 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jul 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06419.9%not counted
NEM 2.022670.2%1 (16.7%)
Net Billing Tariff329.9%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Bedrock Solar’s installs. No residential system in the file lists a third-party owner name that matches Bedrock Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of Bedrock Solar’s 29 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (13, 48.1%) used modules recorded as Aptos Solar.

In the last 24 months, 29 of Bedrock Solar’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (17, 58.6%) used inverters recorded as Aptos Solar.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar1323
Axitec587
Canadian Solar378
SOLAREVERTECNOLOGÍADEAMERICASADECV3not in top list
JA Solar1not in top list
Inverter makerAptos Solar1724
NeoVoltaInc.617
ChiliconPower,LLC5156
APsystems (Altenergy Power System)184
SolarEdge1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 305 of 322 installs, inverters on 320. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bedrock Solar as developer on 6 battery storage projects and as installer on 4 (4 name it as both), 6 projects in all with 144 kWh of storage. 2 have the status Paid, with $7,704 in current incentive allocations. Applications were received from Apr 16, 2020 to Mar 23, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid246$7,704
Cancelled497$17,272

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage597$15,3462$7,704
Large-Scale Storage146$9,6300$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1011093BEDROCK SOLAR (Partnership)CLEARC-46 Solar ContractorFeb 9, 2016Feb 29, 2028266

License numbers are the ones the utilities recorded on the interconnection applications (266 of 322 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1011093. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Bedrock Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County1011093510122928408162150

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange194
San Diego121
Riverside6
Los Angeles1

Top cities

CityInstalls
Borrego Springs187
Oceanside23
San Diego23
Vista14
Carlsbad7
Escondido7
Fallbrook7
San Marcos6
Valley Center6
El Cajon4
Temecula4
Coronado2
Encinitas2
La Jolla2
La Mesa2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bedrock Solar316
BEDROCK SOLAR6

Common questions

Where does Bedrock Solar install solar?

Its installs are spread across 4 counties. The most are in Orange County (194 installs), followed by San Diego County (121).

How often does Bedrock Solar install batteries with solar?

9.1% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Bedrock Solar installs are under NEM 3.0 (the Net Billing Tariff)?

32 of its 322 interconnected installs (9.9% of the 322 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.