Barrier Solar Inc.
How many solar installs has Barrier Solar Inc. done in California, and which license number is on its installs?
Barrier Solar Inc. has 316 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jul 7, 2014 to Apr 15, 2026), most of them in Fresno County (267), Merced County (17) and Madera County (14). CSLB lists license 985005 (BARRIER SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 316
- Last 24 months
- 12
- Total capacity
- 2,838.6 kW DC
- Median system size
- 7.7 kW DC
- With battery storage
- 1.6% all time; 41.7% last 24 months
- Third-party owned
- 34.5% of 316 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 8 installs, latest Feb 26, 2026
- Ownership types recorded
- other 109
- First install
- Jul 7, 2014
- Latest install
- Apr 15, 2026
- Counties
- 15
- Utilities
- PGE 315, SCE 1
- CSLB license
- 985005
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 8 | 0 |
| 2015 | 27 | 0 |
| 2016 | 22 | 0 |
| 2017 | 44 | 0 |
| 2018 | 107 | 0 |
| 2019 | 26 | 0 |
| 2020 | 24 | 0 |
| 2021 | 15 | 0 |
| 2022 | 7 | 0 |
| 2023 | 20 | 0 |
| 2024 | 4 | 0 |
| 2025 | 7 | 2 |
| 2026 (through Aug 31, 2026) | 5 | 3 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
8 of its 316 interconnected installs (2.5% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The latest Net Billing Tariff install was approved Feb 26, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 63 | 19.9% | not counted |
| NEM 2.0 | 245 | 77.5% | 0 (0.0%) |
| Net Billing Tariff | 8 | 2.5% | 5 (62.5%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 109 of Barrier Solar Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 109. Across all installers, 107 residential systems list a third-party owner name that matches Barrier Solar Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Barrier Solar Inc | 107 |
| B | 2 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 11 of Barrier Solar Inc.’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 63.6%) used modules recorded as Canadian Solar.
In the last 24 months, 12 of Barrier Solar Inc.’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 50.0%) used inverters recorded as Enphase.
In the last 24 months, 4 of Barrier Solar Inc.’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as Enphase.
4 of 5 battery-paired PG&E and SCE installs (80.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 7 | 75 |
| Phono Solar Technology | 2 | not in top list | |
| Mitsubishi Electric | 1 | not in top list | |
| SunPower | 1 | 8 | |
| Trina Solar | 1 | 14 | |
| Inverter maker | Enphase | 6 | 168 |
| SMA | 3 | 46 | |
| SolarEdge | 2 | 101 | |
| Yaskawa Solectria Solar | 2 | 2 | |
| Tesla | 1 | not in top list | |
| Battery maker | Enphase | 3 | 3 |
| SolarEdge | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 314 of 316 installs, inverters on 316. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Barrier Solar Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 1,529 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 30, 2022 to Apr 8, 2024.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| PBI in Process | 2 | 1,529 | $378,394 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Large-Scale Storage | 2 | 1,529 | $378,394 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 985005 | BARRIER SOLAR INC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Jul 3, 2013 | Jul 31, 2027 | 316 |
License numbers are the ones the utilities recorded on the interconnection applications (316 of 316 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 985005. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Fresno | 267 |
| Merced | 17 |
| Madera | 14 |
| Calaveras | 2 |
| Monterey | 2 |
| San Mateo | 2 |
| Santa Cruz | 2 |
| Sonoma | 2 |
| Tulare | 2 |
| Kings | 1 |
| Napa | 1 |
| Placer | 1 |
| San Luis Obispo | 1 |
| Santa Clara | 1 |
| Tuolumne | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 228 |
| Clovis | 24 |
| Madera | 13 |
| Los Banos | 7 |
| Dos Palos | 5 |
| Kingsburg | 4 |
| Del Rey | 3 |
| Kerman | 3 |
| Firebaugh | 2 |
| Merced | 2 |
| Santa Rosa | 2 |
| Selma | 2 |
| Valley Springs | 2 |
| Arroyo Grande | 1 |
| Atwater | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Barrier Solar Inc. | 147 |
| BARRIER SOLAR INC | 81 |
| Barrier Solar | 28 |
| Barrier Solar Inc | 28 |
| Barrier Solar, Inc. | 25 |
| Barrier Solar, Inc | 6 |
| Barrier Solar, INC | 1 |
Common questions
Where does Barrier Solar Inc. install solar?
Its installs are spread across 15 counties. The most are in Fresno County (267 installs), followed by Merced County (17).
How often does Barrier Solar Inc. install batteries with solar?
1.6% of its interconnected solar installs include battery storage across all years, and 41.7% in the last 24 months (5 of 12).
How many Barrier Solar Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
8 of its 316 interconnected installs (2.5% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.