ATLAS CONTRACTOR SERVICES

How many solar installs has ATLAS CONTRACTOR SERVICES done in California, and which license number is on its installs?

ATLAS CONTRACTOR SERVICES has 74 residential solar installs interconnected in California, active in the records from 2022 through 2023 (Mar 7, 2022 to Dec 4, 2023), most of them in Solano County (21), Calaveras County (17) and Butte County (7). The license number recorded on most of its installs, 1083056, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
74
Last 24 months
0
Total capacity
619.8 kW DC
Median system size
8.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 74 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 4, 2023
Ownership types recorded
none recorded
First install
Mar 7, 2022
Latest install
Dec 4, 2023
Counties
15
Utilities
PGE 74
CSLB license
1083056

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022530
2023210
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 74 interconnected installs (1.4% of the 74 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 4, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07398.6%0 (0.0%)
Net Billing Tariff11.4%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ATLAS CONTRACTOR SERVICES’s installs. No residential system in the file lists a third-party owner name that matches ATLAS CONTRACTOR SERVICES exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 70 of ATLAS CONTRACTOR SERVICES’ 74 installs name a module maker in the “Generator Manufacturer” fields, and most of those (55, 78.6%) used modules recorded as Qcells.

Across all years, 74 of ATLAS CONTRACTOR SERVICES’ 74 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (71, 95.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells055
REC07
Canadian Solar06
United Renewable Energy02
Inverter makerEnphase071
SolarEdge04
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 70 of 74 installs, inverters on 74. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1083056Not found in the CSLB License Master file pulled Nov 4, 202674

License numbers are the ones the utilities recorded on the interconnection applications (74 of 74 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Solano21
Calaveras17
Butte7
Lake6
Yuba5
San Joaquin3
Sonoma3
Yolo3
Contra Costa2
Glenn2
Alameda1
Napa1
Shasta1
Sutter1
Tehama1

Top cities

CityInstalls
Valley Springs16
Dixon9
Vacaville9
Kelseyville5
Oroville3
Marysville2
Paradise2
Windsor2
Berkeley1
Biggs1
Brentwood1
Brownsville1
Burson1
Chico1
Corning1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ATLAS CONTRACTOR SERVICES74

Common questions

Where does ATLAS CONTRACTOR SERVICES install solar?

Its installs are spread across 15 counties. The most are in Solano County (21 installs), followed by Calaveras County (17).

How often does ATLAS CONTRACTOR SERVICES install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many ATLAS CONTRACTOR SERVICES installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 74 interconnected installs (1.4% of the 74 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.