Acro Electric

How many solar installs has Acro Electric done in California, and which license number is on its installs?

Acro Electric has 283 residential solar installs interconnected in California, active in the records from 2003 through 2011 (Feb 24, 2003 to Nov 8, 2011), most of them in San Joaquin County (72), Stanislaus County (53) and Alameda County (38). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
283
Last 24 months
0
Total capacity
1,876.5 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 283 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Feb 24, 2003
Latest install
Nov 8, 2011
Counties
17
Utilities
PGE 283
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200380
2004150
2005320
2006460
2007570
2008500
2009610
2010130
201110
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 283 interconnected installs with a tariff recorded (283) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0283100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Acro Electric’s installs. No residential system in the file lists a third-party owner name that matches Acro Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 278 of Acro Electric’s 283 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (135, 48.6%) used modules recorded as BP Solar.

Across all years, 283 of Acro Electric’s 283 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (110, 38.9%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerBP Solar0135
SunPower0130
Suntech07
Mitsubishi Electric02
Canadian Solar01
Inverter makerSunPower0110
SMA086
Xantrex Technology Inc.084
Fronius03
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 278 of 283 installs, inverters on 283. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 283 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Joaquin72
Stanislaus53
Alameda38
Merced28
Tuolumne24
Calaveras17
Santa Clara13
Contra Costa10
Mariposa8
Madera7
Monterey7
Amador1
El Dorado1
Fresno1
Kern1
Marin1
Placer1

Top cities

CityInstalls
Oakdale43
Tracy28
Livermore16
Stockton16
Sonora15
Atwater13
Escalon10
Merced10
Ripon7
San Jose7
Pleasanton6
Angels Camp5
Copperopolis5
Madera5
Manteca5

Names as recorded by the utilities

The utilities recorded this installer under 18 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Acro Electric70
Acro Electric, Inc.68
ACRO Electric38
ACRO Electric, Inc.31
Acro Electric Inc24
Acro Electric, Inc13
Acro Electric Inc.10
ACRO Electric, Inc7
ACRO Electric Inc6
ACRO ELECTRIC, INC.4
ACRO Electric Inc.3
ACRO ELECTRIC2
Acro Electric inc2
ACRO Electric INC1
Acro Electric inc.1
ACRO ELectric, Inc1
Acro Electric, inc.1
ACRO Electric, inc.1

Common questions

Where does Acro Electric install solar?

Its installs are spread across 17 counties. The most are in San Joaquin County (72 installs), followed by Stanislaus County (53).

How often does Acro Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Acro Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 283 interconnected installs with a tariff recorded (283) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.