VASCO SOLAR

How many solar installs has VASCO SOLAR done in California, and which license number is on its installs?

VASCO SOLAR has 320 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jul 16, 2015 to Aug 27, 2026), most of them in Orange County (273), Los Angeles County (34) and San Bernardino County (5). CSLB lists license 608260 (VASCO SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
320
Last 24 months
55
Total capacity
2,500.4 kW DC
Median system size
7.7 kW DC
With battery storage
18.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 63.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 320 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
58 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (58 installs list a capacity)
First install
Jul 16, 2015
Latest install
Aug 27, 2026
Counties
5
Utilities
SCE 315, SDGE 4, PGE 1
CSLB license
608260

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201590
201610
2017130
2018280
2019291
2020293
2021453
2022487
2023547
2024205
20253020
2026 (through Aug 31, 2026)1412

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

58 of its 320 interconnected installs (18.1% of the 320 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0103.1%not counted
NEM 2.025278.8%23 (9.3%)
Net Billing Tariff5818.1%35 (60.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on VASCO SOLAR’s installs. No residential system in the file lists a third-party owner name that matches VASCO SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 55 of VASCO SOLAR’s 55 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (25, 45.5%) used modules recorded as REC.

In the last 24 months, 55 of VASCO SOLAR’s 55 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 58.2%) used inverters recorded as SolarEdge.

In the last 24 months, 35 of VASCO SOLAR’s 55 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (17, 48.6%) used batteries recorded as SolarEdge.

58 of 58 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2529
Solaria11198
Aptos Solar99
Hyundai4not in top list
SunPower3not in top list
Inverter makerSolarEdge32197
Enphase2482
Battery makerSolarEdge1731
FranklinWH1414
Enphase46

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 317 of 320 installs, inverters on 320. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names VASCO SOLAR as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 36 kWh of storage. 4 have the status Paid, with $6,645 in current incentive allocations. Applications were received from May 24, 2019 to Oct 13, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid436$6,645

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage436$6,6454$6,645

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
608260VASCO SOLAR (Corporation)CLEARC-46 Solar ContractorDec 19, 1990Nov 30, 2027320

License numbers are the ones the utilities recorded on the interconnection applications (320 of 320 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 608260. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Orange273
Los Angeles34
San Bernardino5
Riverside4
Santa Barbara4

Top cities

CityInstalls
Huntington Beach92
Costa Mesa25
Newport Beach22
Fountain Valley20
Los Alamitos18
Long Beach15
Orange11
Corona del Mar8
Garden Grove8
Irvine8
Santa Ana8
Yorba Linda8
La Mirada6
Westminster6
Fullerton5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VASCO SOLAR303
Vasco Solar17

Common questions

Where does VASCO SOLAR install solar?

Its installs are spread across 5 counties. The most are in Orange County (273 installs), followed by Los Angeles County (34).

How often does VASCO SOLAR install batteries with solar?

18.4% of its interconnected solar installs include battery storage across all years, and 63.6% in the last 24 months (35 of 55). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many VASCO SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

58 of its 320 interconnected installs (18.1% of the 320 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.