VALLEY WATER

How many solar installs has VALLEY WATER done in California, and which license number is on its installs?

VALLEY WATER has 136 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Mar 30, 2017 to Mar 25, 2026), most of them in Fresno County (79), Tulare County (24) and Merced County (11). CSLB lists license 874184 (sole owner license, name not shown) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-46, C-55, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
136
Last 24 months
3
Total capacity
1,011.8 kW DC
Median system size
7.1 kW DC
With battery storage
1.5% all time; 66.7% last 24 months
Third-party owned
0.0% of 136 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Mar 25, 2026
Ownership types recorded
none recorded
Median battery size
7.4 kWh (2 installs list a capacity)
First install
Mar 30, 2017
Latest install
Mar 25, 2026
Counties
8
Utilities
PGE 111, SCE 25
CSLB license
874184

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201750
201880
2019310
2020510
2021260
2022120
202300
202400
202500
2026 (through Aug 31, 2026)32

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 136 interconnected installs (2.2% of the 136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Mar 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.013397.8%0 (0.0%)
Net Billing Tariff32.2%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on VALLEY WATER’s installs. No residential system in the file lists a third-party owner name that matches VALLEY WATER exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of VALLEY WATER’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as JinkoSolar.

In the last 24 months, 3 of VALLEY WATER’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as SolarEdge.

In the last 24 months, 2 of VALLEY WATER’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar34
Inverter makerSolarEdge298
Enphase16
Battery makerEnphase11
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 136 of 136 installs, inverters on 136. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
874184Sole owner license (name not shown)Contr Bond SuspC-46 Solar Contractor; C-55Mar 9, 2006Jun 30, 2027136

License numbers are the ones the utilities recorded on the interconnection applications (136 of 136 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 874184. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno79
Tulare24
Merced11
Madera8
Kings6
Kern5
Santa Clara2
San Joaquin1

Top cities

CityInstalls
Fresno36
Mendota11
Madera8
Visalia7
Los Banos6
Parlier6
Kerman5
Selma4
Clovis3
Dinuba3
Hanford3
Porterville3
Sanger3
Winton3
Bakersfield2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VALLEY WATER123
Valley Water7
valley water4
VALLEY water2

Common questions

Where does VALLEY WATER install solar?

Its installs are spread across 8 counties. The most are in Fresno County (79 installs), followed by Tulare County (24).

How often does VALLEY WATER install batteries with solar?

1.5% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many VALLEY WATER installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 136 interconnected installs (2.2% of the 136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.