Urban Design Solar

How many solar installs has Urban Design Solar done in California, and which license number is on its installs?

Urban Design Solar has 479 residential solar installs interconnected in California, active in the records from 2012 through 2025 (Dec 4, 2012 to Sep 23, 2025), most of them in Butte County (424), Glenn County (16) and Sutter County (11). CSLB lists license 893826 (URBAN DESIGN) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-36, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
479
Last 24 months
5
Total capacity
3,708.2 kW DC
Median system size
7.2 kW DC
With battery storage
0.8% all time; 40.0% last 24 months
Third-party owned
0.0% of 479 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Sep 23, 2025
Ownership types recorded
none recorded
Median battery size
9.4 kWh (2 installs list a capacity)
First install
Dec 4, 2012
Latest install
Sep 23, 2025
Counties
11
Utilities
PGE 479
CSLB license
893826

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201310
2014110
2015480
2016700
2017480
2018800
2019990
2020561
2021571
202210
202310
202410
202552
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 479 interconnected installs (1.3% of the 479 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Sep 23, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013327.8%not counted
NEM 2.034071.0%2 (0.6%)
Net Billing Tariff61.3%2 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Urban Design Solar’s installs. No residential system in the file lists a third-party owner name that matches Urban Design Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Urban Design Solar’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as Qcells.

In the last 24 months, 5 of Urban Design Solar’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Urban Design Solar’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

2 of 4 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5102
Fortress Power LLC1not in top list
Inverter makerEnphase375
Fortress Power LLC11
Tesla12
Battery makerTesla12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 468 of 479 installs, inverters on 479. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Urban Design Solar as developer on 18 battery storage projects and as installer on 12 (12 name it as both), 18 projects in all with 271 kWh of storage. 11 have the status Paid, with $119,741 in current incentive allocations. Applications were received from Sep 5, 2019 to Dec 18, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11135$119,741
Pending Reservation119$18,786
Cancelled6118$87,146

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency12216$213,9509$115,964
Small Residential Storage655$11,7232$3,777

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
893826URBAN DESIGN (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorApr 4, 2007Apr 30, 2027473

License numbers are the ones the utilities recorded on the interconnection applications (476 of 479 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 893826. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte424
Glenn16
Sutter11
Tehama11
Yuba7
Colusa3
Placer2
Shasta2
Mendocino1
Nevada1
San Joaquin1

Top cities

CityInstalls
Chico305
Paradise65
Oroville33
Orland14
Durham10
Yuba City10
Corning4
Marysville4
Red Bluff4
Willows4
Forest Ranch3
Magalia3
Colusa2
Acampo1
Auburn1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Urban Design Solar333
URBAN DESIGN SOLAR146

Common questions

Where does Urban Design Solar install solar?

Its installs are spread across 11 counties. The most are in Butte County (424 installs), followed by Glenn County (16).

How often does Urban Design Solar install batteries with solar?

0.8% of its interconnected solar installs include battery storage across all years, and 40.0% in the last 24 months (2 of 5).

How many Urban Design Solar installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 479 interconnected installs (1.3% of the 479 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.