SUNSCOUT CORP

How many solar installs has SUNSCOUT CORP done in California, and which license number is on its installs?

SUNSCOUT CORP has 59 residential solar installs interconnected in California, active in the records from 2022 through 2024 (Nov 18, 2022 to Aug 5, 2024), most of them in Los Angeles County (19), Orange County (15) and San Bernardino County (14). The license number recorded on most of its installs, 1097588, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
59
Last 24 months
0
Total capacity
516 kW DC
Median system size
8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 59 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Jan 22, 2024
Ownership types recorded
none recorded
First install
Nov 18, 2022
Latest install
Aug 5, 2024
Counties
5
Utilities
SCE 59
CSLB license
1097588

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202240
2023520
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 59 interconnected installs (28.8% of the 59 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 22, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04271.2%0 (0.0%)
Net Billing Tariff1728.8%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNSCOUT CORP’s installs. No residential system in the file lists a third-party owner name that matches SUNSCOUT CORP exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 59 of SUNSCOUT CORP’s 59 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 28.8%) used modules recorded as REC.

Across all years, 59 of SUNSCOUT CORP’s 59 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (36, 61.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC017
Qcells016
Mission Solar014
Solaria010
Canadian Solar02
Inverter makerEnphase036
SolarEdge012
SunPower05
Tesla04
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59 of 59 installs, inverters on 59. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1097588Not found in the CSLB License Master file pulled Nov 4, 202659

License numbers are the ones the utilities recorded on the interconnection applications (59 of 59 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles19
Orange15
San Bernardino14
Riverside8
Ventura3

Top cities

CityInstalls
Brea3
Upland3
Eastvale2
Monterey Park2
Orange2
Pasadena2
Placentia2
San Gabriel2
Alhambra1
Alta Loma1
Apple Valley1
Arcadia1
Baldwin Park1
Beaumont1
Camarillo1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNSCOUT CORP59

Common questions

Where does SUNSCOUT CORP install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (19 installs), followed by Orange County (15).

How often does SUNSCOUT CORP install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many SUNSCOUT CORP installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 59 interconnected installs (28.8% of the 59 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.