SOLIS CONSTRUCTION

How many solar installs has SOLIS CONSTRUCTION done in California, and which license number is on its installs?

SOLIS CONSTRUCTION has 61 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Jan 14, 2011 to Aug 13, 2026), most of them in Fresno County (38), Madera County (10) and Tulare County (4). CSLB lists license 1099365 (SOLIS CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
43
Total capacity
573.6 kW DC
Median system size
8.6 kW DC
With battery storage
96.7% all time; 100.0% last 24 months
Third-party owned
42.6% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
50 installs, latest Aug 13, 2026
Ownership types recorded
PPA 25, lease 1
Median battery size
16.8 kWh (4 installs list a capacity)
First install
Jan 14, 2011
Latest install
Aug 13, 2026
Counties
10
Utilities
PGE 56, SCE 5
CSLB license
1099365

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202310
20243030
20251414
2026 (through Aug 31, 2026)1515

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

50 of its 61 interconnected installs (82.0% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.069.8%not counted
NEM 2.058.2%4 (80.0%)
Net Billing Tariff5082.0%50 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 26 of SOLIS CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 25, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SOLIS CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Solwerks19
Lightreach3
Goodleap2
Palmetto Lightreach1
Solwerks Power Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 39 of SOLIS CONSTRUCTION’s 43 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 43.6%) used modules recorded as LONGi.

In the last 24 months, 43 of SOLIS CONSTRUCTION’s 43 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 95.3%) used inverters recorded as Enphase.

In the last 24 months, 39 of SOLIS CONSTRUCTION’s 43 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (37, 94.9%) used batteries recorded as Enphase.

55 of 59 battery-paired PG&E and SCE installs (93.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1718
JinkoSolar1111
Qcells610
Phono Solar Technology211
SunPower2not in top list
Inverter makerEnphase4158
SunPower22
Tesla22
Power-One11
PV Powered1not in top list
Battery makerEnphase3753
Tesla22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 56 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1099365SOLIS CONSTRUCTION (Corporation)CLEARB General Building ContractorDec 6, 2022Dec 31, 202660

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1099365. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno38
Madera10
Tulare4
Kings3
Mariposa1
Merced1
Riverside1
Santa Clara1
Santa Cruz1
Shasta1

Top cities

CityInstalls
Fresno19
Clovis16
Madera8
Dinuba2
Hanford2
Oakhurst2
Visalia2
Corona1
Lemoore1
Mariposa1
Merced1
Pinedale1
Redding1
San Jose1
Sanger1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLIS CONSTRUCTION61

Common questions

Where does SOLIS CONSTRUCTION install solar?

Its installs are spread across 10 counties. The most are in Fresno County (38 installs), followed by Madera County (10).

How often does SOLIS CONSTRUCTION install batteries with solar?

96.7% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (43 of 43).

How many SOLIS CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

50 of its 61 interconnected installs (82.0% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.