SOLAR FLARE

How many solar installs has SOLAR FLARE done in California, and which license number is on its installs?

SOLAR FLARE has 92 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Aug 3, 2019 to Aug 14, 2026), most of them in Riverside County (71), Los Angeles County (12) and San Bernardino County (4). CSLB lists license 1047741 (SOLAR FLARE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
92
Last 24 months
23
Total capacity
566.1 kW DC
Median system size
3.7 kW DC
With battery storage
6.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 8.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 92 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
45 installs, latest Aug 14, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (5 installs list a capacity)
First install
Aug 3, 2019
Latest install
Aug 14, 2026
Counties
6
Utilities
SCE 90, PGE 1, SDGE 1
CSLB license
1047741

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202010
202190
2022220
2023253
2024121
2025112
2026 (through Aug 31, 2026)110

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

45 of its 92 interconnected installs (48.9% of the 92 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 8.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04751.1%2 (4.3%)
Net Billing Tariff4548.9%4 (8.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLAR FLARE’s installs. No residential system in the file lists a third-party owner name that matches SOLAR FLARE exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 23 of SOLAR FLARE’s 23 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 60.9%) used modules recorded as Qcells.

In the last 24 months, 23 of SOLAR FLARE’s 23 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 91.3%) used inverters recorded as Enphase.

In the last 24 months, 2 of SOLAR FLARE’s 23 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

5 of 6 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1453
JA Solar55
LONGi2not in top list
Resun Solar2not in top list
Canadian Solar14
Inverter makerEnphase2159
Sol-Ark1not in top list
SolarEdge123
Battery makerEnphase25

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 92 installs, inverters on 92. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1047741SOLAR FLARE INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorDec 10, 2018Sep 30, 202792

License numbers are the ones the utilities recorded on the interconnection applications (92 of 92 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1047741. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Riverside71
Los Angeles12
San Bernardino4
Orange3
Fresno1
San Diego1

Top cities

CityInstalls
Desert Hot Springs50
Palm Springs5
Alhambra4
Cathedral City4
Arcadia2
Baldwin Park2
Blythe2
Palm Desert2
Rancho Mirage2
San Bernardino2
Beaumont1
Bloomington1
Carson1
Corona1
Covina1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR FLARE51
SOLAR FLARE INC40
Solar Flare1

Common questions

Where does SOLAR FLARE install solar?

Its installs are spread across 6 counties. The most are in Riverside County (71 installs), followed by Los Angeles County (12).

How often does SOLAR FLARE install batteries with solar?

6.6% of its interconnected solar installs include battery storage across all years, and 8.7% in the last 24 months (2 of 23). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLAR FLARE installs are under NEM 3.0 (the Net Billing Tariff)?

45 of its 92 interconnected installs (48.9% of the 92 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 8.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.