SIMPLE POWER CA

How many solar installs has SIMPLE POWER CA done in California, and which license number is on its installs?

SIMPLE POWER CA has 65 residential solar installs interconnected in California, active in the records from 2024 through 2026 (May 30, 2024 to May 5, 2026), most of them in Kern County (20), Santa Clara County (18) and Tulare County (9). CSLB lists license 1111652 (SIMPLE POWER CA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
65
Last 24 months
55
Total capacity
498.9 kW DC
Median system size
6.6 kW DC
With battery storage
90.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 96.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
67.7% of 65 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
65 installs, latest May 5, 2026
Ownership types recorded
PPA 42, other 2
Median battery size
10 kWh (24 installs list a capacity)
First install
May 30, 2024
Latest install
May 5, 2026
Counties
14
Utilities
PGE 51, SCE 12, SDGE 2
CSLB license
1111652

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20242215
20253837
2026 (through Aug 31, 2026)55

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

65 of its 65 interconnected installs (100.0% of the 65 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved May 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff65100.0%57 (90.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 44 of SIMPLE POWER CA’s installs the utility recorded a third-party ownership type: PPA 42, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches SIMPLE POWER CA exactly.

Third-party owner named on its installsInstalls
LightReach16
LightReach Finance13
Palmetto3
Solrite3
Sunpower3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 53 of SIMPLE POWER CA’s 55 installs name a module maker in the “Generator Manufacturer” fields, and most of those (30, 56.6%) used modules recorded as Hyundai.

In the last 24 months, 55 of SIMPLE POWER CA’s 55 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 51 of SIMPLE POWER CA’s 55 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (24, 47.1%) used batteries recorded as Enphase.

56 of 57 battery-paired PG&E and SCE installs (98.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai3030
Qcells89
JA Solar66
Canadian Solar47
United Renewable Energy2not in top list
Inverter makerEnphase3343
SolarEdge2222
ABB11
SMA1not in top list
Sol-Ark1not in top list
Battery makerEnphase2425
SolarEdge2121
Tesla33
sonnen14
Storz Power1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 65 installs, inverters on 65. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1111652SIMPLE POWER CA (Limited Liability)CLEAR, Pending IFSC-10 Electrical ContractorOct 20, 2023Oct 31, 202765

License numbers are the ones the utilities recorded on the interconnection applications (65 of 65 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending suspension date of Jan 28, 2027 for license 1111652. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list SIMPLE POWER CA’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
City and County of San Francisco1111652112
unincorporated San Diego County1111652101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern20
Santa Clara18
Tulare9
Merced5
Alameda2
Contra Costa2
San Diego2
Fresno1
Kings1
Los Angeles1
Marin1
Mendocino1
San Francisco1
Santa Barbara1

Top cities

CityInstalls
Bakersfield10
San Jose7
Sunnyvale5
Los Banos4
Wasco4
Porterville3
Shafter3
Cupertino2
Gilroy2
Lindsay2
Milpitas2
Newark2
Brentwood1
Buellton1
Delano1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SIMPLE POWER CA63
Simple Power CA2

Common questions

Where does SIMPLE POWER CA install solar?

Its installs are spread across 14 counties. The most are in Kern County (20 installs), followed by Santa Clara County (18).

How often does SIMPLE POWER CA install batteries with solar?

90.5% of its interconnected solar installs include battery storage across all years, and 96.2% in the last 24 months (51 of 53). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SIMPLE POWER CA installs are under NEM 3.0 (the Net Billing Tariff)?

65 of its 65 interconnected installs (100.0% of the 65 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.