Robinson Electric

How many solar installs has Robinson Electric done in California, and which license number is on its installs?

Robinson Electric has 125 residential solar installs interconnected in California, active in the records from 2004 through 2022 (May 26, 2004 to Oct 25, 2022), most of them in Alameda County (59), Contra Costa County (28) and San Diego County (28). CSLB lists license 881721 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Robinson Electric here carry more than one CSLB license number: 881721 on 65 (CSLB holder Sole owner license (name not shown)) and 991721 on 18 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
125
Last 24 months
0
Total capacity
676.2 kW DC
Median system size
5.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 97 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 26, 2004
Latest install
Oct 25, 2022
Counties
6
Utilities
PGE 97, SDGE 28
CSLB license
881721, 991721

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
2004270
200500
200600
200700
200800
200910
201000
201100
201220
201350
201470
2015170
2016210
2017160
2018140
201960
202050
202130
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 125 interconnected installs with a tariff recorded (125) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08265.6%not counted
NEM 2.04334.4%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Robinson Electric’s installs. No residential system in the file lists a third-party owner name that matches Robinson Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 97 of Robinson Electric’s 125 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (43, 44.3%) used modules recorded as SolarWorld.

Across all years, 97 of Robinson Electric’s 125 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (90, 92.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld043
Solaria024
Canadian Solar08
LG07
Qcells06
Inverter makerEnphase090
APsystems (Altenergy Power System)04
SMA02
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 97 of 125 installs, inverters on 97. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
881721Sole owner license (name not shown)CLEARC-10 Electrical ContractorJul 29, 2006Jul 31, 202865
991721Not found in the CSLB License Master file pulled Nov 4, 202618

License numbers are the ones the utilities recorded on the interconnection applications (83 of 125 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 881721. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Alameda59
Contra Costa28
San Diego28
San Joaquin6
Santa Clara2
Solano2

Top cities

CityInstalls
Livermore54
San Marcos27
Danville6
San Ramon6
Brentwood4
Tracy4
Byron3
Pleasanton3
Antioch2
Vallejo2
Alamo1
Castro Valley1
Concord1
Discovery Bay1
Knightsen1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Robinson Electric113
ROBINSON ELECTRIC12

Common questions

Where does Robinson Electric install solar?

Its installs are spread across 6 counties. The most are in Alameda County (59 installs), followed by Contra Costa County (28).

How often does Robinson Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Robinson Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 125 interconnected installs with a tariff recorded (125) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.