Progressive Power Group, Inc.

How many solar installs has Progressive Power Group, Inc. done in California, and which license number is on its installs?

Progressive Power Group, Inc. has 178 residential solar installs interconnected in California, active in the records from 2007 through 2020 (Aug 15, 2007 to Feb 7, 2020), most of them in Orange County (99), Los Angeles County (38) and Riverside County (19). The license number recorded on most of its installs, 928459, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
178
Last 24 months
0
Total capacity
1,246.5 kW DC
Median system size
5.6 kW DC
With battery storage
1.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
7.7% of 168 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 6, prepaid lease 6, other 1
Median battery size
9.8 kWh (2 installs list a capacity)
First install
Aug 15, 2007
Latest install
Feb 7, 2020
Counties
9
Utilities
SCE 150, SDGE 25, PGE 3
CSLB license
928459

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200730
200830
2009170
2010330
2011180
201210
201350
201420
2015190
2016250
2017240
2018141
201990
202051
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 178 interconnected installs with a tariff recorded (178) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013978.1%not counted
NEM 2.03921.9%2 (8.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 13 of Progressive Power Group, Inc.’s installs the utility recorded a third-party ownership type: PPA 6, lease 0, prepaid lease 6, other 1. Across all installers, 13 residential systems list a third-party owner name that matches Progressive Power Group, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Progressive Power Group12
Calidonna, Eugene1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 101 of Progressive Power Group, Inc.’s 178 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (24, 23.8%) used modules recorded as Canadian Solar.

Across all years, 176 of Progressive Power Group, Inc.’s 178 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (61, 34.7%) used inverters recorded as Enphase.

Across all years, 2 of Progressive Power Group, Inc.’s 178 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar024
Solaria018
REC012
Suniva011
Qcells09
Inverter makerEnphase061
Fronius045
SolarEdge031
SMA025
Advanced Energy, Inc.013
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 178 installs, inverters on 176. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Progressive Power Group, Inc. as developer on 15 battery storage projects and as installer on 5 (1 name it as both), 19 projects in all with 558 kWh of storage. 8 have the status Paid, with $164,344 in current incentive allocations. Applications were received from Apr 12, 2012 to Jul 23, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8166$164,344
Cancelled11393$278,833

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency12320$316,2803$78,680
Large-Scale Storage2155$41,2330$0
Small Residential Storage217$5,4562$5,456
Not stated367$80,2083$80,208

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
928459Not found in the CSLB License Master file pulled Nov 4, 2026168

License numbers are the ones the utilities recorded on the interconnection applications (168 of 178 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Orange99
Los Angeles38
Riverside19
San Diego10
San Bernardino8
Kern1
San Luis Obispo1
Santa Cruz1
Ventura1

Top cities

CityInstalls
Los Alamitos18
Long Beach17
Huntington Beach12
Seal Beach12
Cypress8
Dana Point5
Fullerton5
Garden Grove4
Riverside4
Santa Ana4
Laguna Hills3
Lakewood3
Mission Viejo3
Rch Msn Viejo3
San Diego3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Progressive Power Group, Inc.69
Progressive Power Group, Inc51
Progressive Power Group30
PROGRESSIVE POWER GROUP INC21
PROGRESSIVE POWER GROUP, INC.6
Progressive Power Group Inc1

Common questions

Where does Progressive Power Group, Inc. install solar?

Its installs are spread across 9 counties. The most are in Orange County (99 installs), followed by Los Angeles County (38).

How often does Progressive Power Group, Inc. install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Progressive Power Group, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 178 interconnected installs with a tariff recorded (178) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.