Progressive Power

How many solar installs has Progressive Power done in California, and which license number is on its installs?

Progressive Power has 169 residential solar installs interconnected in California, active in the records from 2010 through 2015 (Feb 18, 2010 to May 15, 2015), most of them in Orange County (56), Riverside County (48) and Los Angeles County (43). The license number recorded on most of its installs, 928459, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
169
Last 24 months
0
Total capacity
1,086.6 kW DC
Median system size
5.9 kW DC
With battery storage
0.6% all time; no installs in the last 24 months last 24 months
Third-party owned
59.5% of 126 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 68, lease 7
Median battery size
15.6 kWh (1 installs list a capacity)
First install
Feb 18, 2010
Latest install
May 15, 2015
Counties
5
Utilities
SCE 169
CSLB license
928459

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
2011130
2012190
2013580
2014591
2015180
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 169 interconnected installs with a tariff recorded (169) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0169100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 75 of Progressive Power’s installs the utility recorded a third-party ownership type: PPA 68, lease 7, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Progressive Power exactly.

Third-party owner named on its installsInstalls
Kilowatt Systems, LLC45
Tredegar Solar Fund I, LLC15
Sunnova3
Sunrun3
NRG SunCap LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1 of Progressive Power’s 169 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Sharp.

Across all years, 169 of Progressive Power’s 169 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (126, 74.6%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp01
Sun Xtender01
Inverter makerEnphase0126
SMA020
Advanced Energy, Inc.09
SolarEdge08
ABB02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 169 installs, inverters on 169. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
928459Not found in the CSLB License Master file pulled Nov 4, 2026166

License numbers are the ones the utilities recorded on the interconnection applications (169 of 169 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Orange56
Riverside48
Los Angeles43
San Bernardino21
Kern1

Top cities

CityInstalls
Corona19
Long Beach11
Huntington Beach10
Redlands8
Los Alamitos7
Murrieta7
Irvine6
Mission Viejo5
Riverside4
Temecula4
West Covina4
Cerritos3
Fullerton3
Garden Grove3
Glendora3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PROGRESSIVE POWER136
Progressive Power33

Common questions

Where does Progressive Power install solar?

Its installs are spread across 5 counties. The most are in Orange County (56 installs), followed by Riverside County (48).

How often does Progressive Power install batteries with solar?

0.6% of its interconnected solar installs include battery storage across all years.

How many Progressive Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 169 interconnected installs with a tariff recorded (169) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.