Photon Brothers
How many solar installs has Photon Brothers done in California, and which license number is on its installs?
Photon Brothers has 911 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jan 7, 2015 to Aug 27, 2026), most of them in San Luis Obispo County (568), Santa Barbara County (225) and Ventura County (40). CSLB lists license 1003044 (PHOTON BROTHERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Photon Brothers here carry more than one CSLB license number: 1003044 on 894 (CSLB holder PHOTON BROTHERS, Westminster) and 907508 on 12 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 911
- Last 24 months
- 282
- Total capacity
- 6,076.8 kW DC
- Median system size
- 5.8 kW DC
- With battery storage
- 56.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 96.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 2.3% of 911 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 257 installs, latest Aug 27, 2026
- Ownership types recorded
- lease 16, prepaid lease 5
- Median battery size
- 13.5 kWh (329 installs list a capacity)
- First install
- Jan 7, 2015
- Latest install
- Aug 27, 2026
- Counties
- 16
- Utilities
- PGE 748, SCE 162, SDGE 1
- CSLB license
- 1003044, 907508
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 37 | 0 |
| 2016 | 48 | 0 |
| 2017 | 38 | 0 |
| 2018 | 31 | 0 |
| 2019 | 19 | 2 |
| 2020 | 18 | 3 |
| 2021 | 115 | 68 |
| 2022 | 85 | 54 |
| 2023 | 156 | 72 |
| 2024 | 101 | 66 |
| 2025 | 165 | 156 |
| 2026 (through Aug 31, 2026) | 98 | 96 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
257 of its 911 interconnected installs (28.2% of the 911 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 105 | 11.5% | not counted |
| NEM 2.0 | 549 | 60.3% | 246 (44.8%) |
| Net Billing Tariff | 257 | 28.2% | 254 (98.8%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 21 of Photon Brothers’s installs the utility recorded a third-party ownership type: PPA 0, lease 16, prepaid lease 5, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Photon Brothers exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Participate Energy LLC | 7 |
| Participate Holdings LLC | 7 |
| SunPower | 4 |
| Participate LLC | 1 |
| Photon Brothers | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 253 of Photon Brothers’ 282 installs name a module maker in the “Generator Manufacturer” fields, and most of those (148, 58.5%) used modules recorded as SEG Solar.
In the last 24 months, 282 of Photon Brothers’ 282 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (237, 84.0%) used inverters recorded as Tesla.
In the last 24 months, 179 of Photon Brothers’ 282 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (179, 100.0%) used batteries recorded as Tesla.
381 of 517 battery-paired PG&E and SCE installs (73.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SEG Solar | 148 | 148 |
| REC | 43 | 227 | |
| Qcells | 20 | 110 | |
| Hyundai | 14 | not in top list | |
| SunPower | 10 | 138 | |
| Inverter maker | Tesla | 237 | 483 |
| SolarEdge | 34 | 237 | |
| Enphase | 24 | 164 | |
| ABB | 13 | not in top list | |
| Fronius | 11 | not in top list | |
| Battery maker | Tesla | 179 | 357 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 817 of 911 installs, inverters on 911. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Photon Brothers as developer on 634 battery storage projects and as installer on 630 (627 name it as both), 637 projects in all with 15,976 kWh of storage. 425 have the status Paid, with $7,858,493 in current incentive allocations. Applications were received from Jun 21, 2018 to Apr 23, 2026.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 425 | 10,482 | $7,858,493 |
| Reserved | 26 | 450 | $233,979 |
| Waitlist | 1 | 13 | $13,300 |
| Cancelled | 184 | 5,018 | $4,186,412 |
| RRF Rejected | 1 | 13 | $2,640 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Equity Resiliency | 417 | 11,653 | $11,511,463 | 273 | $7,360,967 |
| Small Residential Storage | 196 | 3,486 | $564,444 | 143 | $421,374 |
| Large-Scale Storage | 21 | 797 | $182,318 | 9 | $76,152 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 2 | 26 | $33,959 | 0 | $0 |
| Not stated | 1 | 13 | $2,640 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1003044 | PHOTON BROTHERS (Corporation) | CLEAR, WC Susp Pending | C-10 Electrical Contractor | Apr 21, 2015 | Apr 30, 2027 | 894 |
| 907508 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Dec 5, 2007 | Jul 31, 2028 | 12 |
License numbers are the ones the utilities recorded on the interconnection applications (910 of 911 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1003044, 907508. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| San Luis Obispo | 568 |
| Santa Barbara | 225 |
| Ventura | 40 |
| Santa Clara | 25 |
| Monterey | 16 |
| Kern | 11 |
| Los Angeles | 6 |
| Alameda | 5 |
| Fresno | 4 |
| San Mateo | 3 |
| Lake | 2 |
| Sonoma | 2 |
| Orange | 1 |
| San Benito | 1 |
| San Diego | 1 |
| Tulare | 1 |
Top cities
| City | Installs |
|---|---|
| San Luis Obispo | 124 |
| Arroyo Grande | 82 |
| Santa Barbara | 81 |
| Santa Maria | 64 |
| Atascadero | 48 |
| Los Osos | 48 |
| Nipomo | 47 |
| Pismo Beach | 43 |
| Paso Robles | 42 |
| Goleta | 29 |
| Morro Bay | 24 |
| Cambria | 23 |
| Lompoc | 20 |
| Templeton | 20 |
| Grover Beach | 19 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| PHOTON BROTHERS INC | 445 |
| PHOTON BROTHERS | 303 |
| Photon Brothers | 130 |
| Photon Brothers Inc. | 29 |
| Photon Brothers Inc | 4 |
Common questions
Where does Photon Brothers install solar?
Its installs are spread across 16 counties. The most are in San Luis Obispo County (568 installs), followed by Santa Barbara County (225).
How often does Photon Brothers install batteries with solar?
56.8% of its interconnected solar installs include battery storage across all years, and 96.1% in the last 24 months (271 of 282). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Photon Brothers installs are under NEM 3.0 (the Net Billing Tariff)?
257 of its 911 interconnected installs (28.2% of the 911 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.