Phoenix Energy Solutions

How many solar installs has Phoenix Energy Solutions done in California, and which license number is on its installs?

Phoenix Energy Solutions has 103 residential solar installs interconnected in California, active in the records from 2014 through 2026 (May 19, 2014 to Jul 14, 2026), most of them in El Dorado County (63), Placer County (15) and Amador County (13). CSLB lists license 981354 (PHOENIX ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
103
Last 24 months
6
Total capacity
870 kW DC
Median system size
8.1 kW DC
With battery storage
14.6% all time; 100.0% last 24 months
Third-party owned
0.0% of 103 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Jul 14, 2026
Ownership types recorded
none recorded
Median battery size
9.5 kWh (4 installs list a capacity)
First install
May 19, 2014
Latest install
Jul 14, 2026
Counties
9
Utilities
PGE 103
CSLB license
981354

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
201500
2016110
2017110
2018170
201970
202031
2021272
2022122
202363
202422
202533
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 103 interconnected installs (5.8% of the 103 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01413.6%not counted
NEM 2.08380.6%9 (10.8%)
Net Billing Tariff65.8%6 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Phoenix Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches Phoenix Energy Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Phoenix Energy Solutions’ 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as Qcells.

In the last 24 months, 6 of Phoenix Energy Solutions’ 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of Phoenix Energy Solutions’ 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

13 of 15 battery-paired PG&E and SCE installs (86.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells428
LONGi1not in top list
Inverter makerEnphase637
General Electric11
Battery makerEnphase58

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 98 of 103 installs, inverters on 103. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Phoenix Energy Solutions as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 19 kWh of storage. 1 have the status Paid, with $2,881 in current incentive allocations. Applications were received from Jun 28, 2022 to Jun 28, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid119$2,881

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage119$2,8811$2,881

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
981354PHOENIX ENERGY SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorFeb 26, 2013Feb 28, 2027102

License numbers are the ones the utilities recorded on the interconnection applications (102 of 103 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 981354. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado63
Placer15
Amador13
Yolo4
Solano3
San Joaquin2
Merced1
Santa Cruz1
Sutter1

Top cities

CityInstalls
El Dorado Hills23
Cameron Park14
Shingle Springs12
Placerville7
Granite Bay6
Pioneer4
Camino3
El Dorado3
Ione3
Lincoln3
Pine Grove3
Rocklin3
Auburn2
Dixon2
West Sacramento2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PHOENIX ENERGY SOLUTIONS INC58
Phoenix Energy Solutions15
Phoenix Energy Solutions Inc15
Phoenix Energy Solutions, Inc9
Phoenix Energy Solutions, Inc,6

Common questions

Where does Phoenix Energy Solutions install solar?

Its installs are spread across 9 counties. The most are in El Dorado County (63 installs), followed by Placer County (15).

How often does Phoenix Energy Solutions install batteries with solar?

14.6% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (6 of 6).

How many Phoenix Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 103 interconnected installs (5.8% of the 103 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.