How many solar installs has Paramount Energy done in California, and which license number is on its installs?

Paramount Energy has 207 residential solar installs interconnected in California, active in the records from 2012 through 2015 (Oct 25, 2012 to Sep 14, 2015), most of them in Los Angeles County (65), San Bernardino County (41) and Riverside County (38). The license number recorded on most of its installs, 972827, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
207
Last 24 months
0
Total capacity
1,028 kW DC
Median system size
4.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
97.8% of 178 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 145, lease 29
First install
Oct 25, 2012
Latest install
Sep 14, 2015
Counties
10
Utilities
SCE 207
CSLB license
972827

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201230
20131840
2014190
201510
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 207 interconnected installs with a tariff recorded (207) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0207100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 174 of Paramount Energy’s installs the utility recorded a third-party ownership type: PPA 145, lease 29, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Paramount Energy exactly.

Third-party owner named on its installsInstalls
Paramount Energy Fund I Lessor, LLC81
Kilowatt Systems, LLC46
Mysolar I LLC26
Paramount Energy Fund 1 Lessor, LLC11
Greenday Finance 1, LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1 of Paramount Energy’s 207 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as SolarWorld.

Across all years, 207 of Paramount Energy’s 207 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (165, 79.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld01
Inverter makerEnphase0165
SMA041
Power-One01
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 207 installs, inverters on 207. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972827Not found in the CSLB License Master file pulled Nov 4, 2026206

License numbers are the ones the utilities recorded on the interconnection applications (207 of 207 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles65
San Bernardino41
Riverside38
Tulare21
Orange18
Kern9
Ventura8
Kings3
Santa Barbara3
Inyo1

Top cities

CityInstalls
Corona21
Visalia13
Palmdale12
Apple Valley9
Lancaster8
Yucaipa6
Delano5
Rialto5
Orange4
Porterville4
Rancho Cucamonga4
Simi Valley4
Tulare4
Downey3
Palm Springs3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PARAMOUNT ENERGY134
Paramount Energy73

Common questions

Where does Paramount Energy install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (65 installs), followed by San Bernardino County (41).

How often does Paramount Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Paramount Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 207 interconnected installs with a tariff recorded (207) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources