Newport Power

How many solar installs has Newport Power done in California, and which license number is on its installs?

Newport Power has 85 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Oct 13, 2010 to Jan 16, 2026), most of them in San Diego County (73), Orange County (9) and Los Angeles County (1). CSLB lists license 939960 (NEWPORT POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
85
Last 24 months
1
Total capacity
878.2 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 69 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jan 16, 2026
Ownership types recorded
none recorded
First install
Oct 13, 2010
Latest install
Jan 16, 2026
Counties
5
Utilities
SDGE 79, SCE 6
CSLB license
939960

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201100
201220
201350
201440
2015180
2016120
201750
201800
201950
202050
202110
2022130
202390
202440
202500
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 85 interconnected installs (1.2% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jan 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03945.9%not counted
NEM 2.04552.9%not recorded
Net Billing Tariff11.2%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Newport Power’s installs. No residential system in the file lists a third-party owner name that matches Newport Power exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Newport Power’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Silfab.

In the last 24 months, 1 of Newport Power’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1not in top list
Inverter makerEnphase179

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 79 of 85 installs, inverters on 83. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Newport Power as developer on 0 battery storage projects and as installer on 11 (0 name it as both), 11 projects in all with 5,208 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jul 25, 2024 to Aug 8, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved115,208$2,164,669

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage84,024$1,209,8280$0
Non-Residential Storage Equity2947$804,8310$0
Equity Resiliency1237$150,0100$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
939960NEWPORT POWER (Corporation)CLEARA General Engineering Contractor; C-10 Electrical ContractorNov 9, 2009Nov 30, 202747

License numbers are the ones the utilities recorded on the interconnection applications (51 of 85 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 939960. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Newport Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202220232024Total
unincorporated San Diego County939960111227

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego73
Orange9
Los Angeles1
Riverside1
San Bernardino1

Top cities

CityInstalls
San Diego24
Encinitas9
San Marcos9
Vista6
Carlsbad5
Poway5
Escondido3
La Jolla2
Rancho Santa Fe2
San Clemente2
Bonsall1
Cardiff1
Chino Hills1
Coto de Caza1
Dana Point1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Newport Power83
NEWPORT POWER2

Common questions

Where does Newport Power install solar?

Its installs are spread across 5 counties. The most are in San Diego County (73 installs), followed by Orange County (9).

How often does Newport Power install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Newport Power installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 85 interconnected installs (1.2% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.