New Energy

How many solar installs has New Energy done in California, and which license number is on its installs?

New Energy has 43 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Oct 8, 2008 to Jul 8, 2026), most of them in Los Angeles County (18), Orange County (7) and Riverside County (7). The license number recorded on most of its installs, 909031, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1119472 (NEW CORP ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028, recorded on 12 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to New Energy here carry more than one CSLB license number: 909031 on 30 (not found in the CSLB License Master file) and 1119472 on 12 (CSLB holder NEW CORP ENERGY, Coachella), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
43
Last 24 months
12
Total capacity
247.9 kW DC
Median system size
4.9 kW DC
With battery storage
21.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 81.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
12.5% of 32 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Jul 8, 2026
Ownership types recorded
PPA 3, other 1
Median battery size
13.5 kWh (9 installs list a capacity)
First install
Oct 8, 2008
Latest install
Jul 8, 2026
Counties
7
Utilities
SCE 42, SDGE 1
CSLB license
909031, 1119472

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200810
200900
201020
201120
201210
2013200
201430
201510
201600
201710
201800
201900
202000
202100
202200
202300
202400
2025108
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 43 interconnected installs (23.3% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.8% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 8, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03069.8%not counted
NEM 2.037.0%2 (66.7%)
Net Billing Tariff1023.3%7 (77.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of New Energy’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches New Energy exactly.

Third-party owner named on its installsInstalls
Palmetto Lightreach2
Daniels, Alonzo1
LightReach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of New Energy’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 66.7%) used modules recorded as JA Solar.

In the last 24 months, 12 of New Energy’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 58.3%) used inverters recorded as Tesla.

In the last 24 months, 9 of New Energy’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 88.9%) used batteries recorded as Tesla.

9 of 9 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar88
Meyer Burger11
Qcells11
Sanyo11
SolarWorld12
Inverter makerTesla77
Enphase513
SMA18
SolarEdge1not in top list
SunPower1not in top list
Battery makerTesla88
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 13 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
909031Not found in the CSLB License Master file pulled Nov 4, 202630
1119472NEW CORP ENERGY (Corporation)CLEARC-10 Electrical ContractorApr 17, 2024Apr 30, 202812

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1119472. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles18
Orange7
Riverside7
San Bernardino5
Santa Barbara3
Ventura2
San Diego1

Top cities

CityInstalls
Lake Elsinore2
Manhattan Beach2
Orange2
Santa Barbara2
Temple City2
Valencia2
Winchester2
Acton1
Adelanto1
Arcadia1
Camarillo1
Carson1
Cathedral City1
Chino1
Corona1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEW ENERGY21
NEW CORP ENERGY11
New Energy10
New Corp Energy1

Common questions

Where does New Energy install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (18 installs), followed by Orange County (7).

How often does New Energy install batteries with solar?

21.4% of its interconnected solar installs include battery storage across all years, and 81.8% in the last 24 months (9 of 11). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many New Energy installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 43 interconnected installs (23.3% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.8% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.