N T W CONSTRUCTION

How many solar installs has N T W CONSTRUCTION done in California, and which license number is on its installs?

N T W CONSTRUCTION has 63 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Oct 27, 2021 to Apr 23, 2025), most of them in Kern County (22), Fresno County (12) and Shasta County (4). The license number recorded on most of its installs, 1079237, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
63
Last 24 months
3
Total capacity
537.6 kW DC
Median system size
8 kW DC
With battery storage
3.2% all time; 0.0% last 24 months
Third-party owned
6.3% of 63 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Aug 29, 2023
Ownership types recorded
PPA 4
First install
Oct 27, 2021
Latest install
Apr 23, 2025
Counties
19
Utilities
PGE 63
CSLB license
1079237

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
2022291
2023251
202470
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 63 interconnected installs (1.6% of the 63 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 29, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06298.4%2 (3.2%)
Net Billing Tariff11.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of N T W CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 4, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches N T W CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Sunnova4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of N T W CONSTRUCTION’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Qcells.

In the last 24 months, 3 of N T W CONSTRUCTION’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Enphase.

In the last 24 months, none of N T W CONSTRUCTION’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells244
Solar4America Technology Inc.1not in top list
Inverter makerEnphase254
APsystems (Altenergy Power System)11
Battery makerEnphase01
LG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 57 of 63 installs, inverters on 63. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1079237Not found in the CSLB License Master file pulled Nov 4, 202663

License numbers are the ones the utilities recorded on the interconnection applications (63 of 63 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list N T W CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated San Diego County107923733

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern22
Fresno12
Shasta4
Tulare4
Santa Clara3
Tehama3
Contra Costa2
Nevada2
Calaveras1
El Dorado1
Glenn1
Kings1
Madera1
Mariposa1
Monterey1
San Luis Obispo1
Solano1
Tuolumne1
Yolo1

Top cities

CityInstalls
Bakersfield21
Clovis4
Cutler4
Fresno3
Milpitas3
Parlier2
Red Bluff2
Anderson1
Arroyo Grande1
Auburn1
Concord1
Corning1
Cottonwood1
El Dorado Hills1
Fall River Mills1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
N T W CONSTRUCTION63

Common questions

Where does N T W CONSTRUCTION install solar?

Its installs are spread across 19 counties. The most are in Kern County (22 installs), followed by Fresno County (12).

How often does N T W CONSTRUCTION install batteries with solar?

3.2% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3).

How many N T W CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 63 interconnected installs (1.6% of the 63 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.