Mona Lee Inc has 60 residential solar installs interconnected in California, active in the records from 2023 through 2026 (May 1, 2023 to May 12, 2026), most of them in San Diego County (53) and Orange County (7). The license number recorded on most of its installs, 1106502, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 972274 (MYERS ELECTRIC COMPANY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027, recorded on 16 of its installs.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Mona Lee Inc here carry more than one CSLB license number: 1106502 on 31 (not found in the CSLB License Master file), 972274 on 16 (CSLB holder MYERS ELECTRIC COMPANY INC, Colton) and 971156 on 13 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 60
- Last 24 months
- 24
- Total capacity
- 399.1 kW DC
- Median system size
- 5.8 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 3.3% of 60 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 46 installs, latest May 12, 2026
- Ownership types recorded
- PPA 2
- First install
- May 1, 2023
- Latest install
- May 12, 2026
- Counties
- 2
- Utilities
- SDGE 60
- CSLB license
- 1106502, 972274, 971156
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2023 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2023 | 17 | 0 |
| 2024 | 24 | 0 |
| 2025 | 18 | 0 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
46 of its 60 interconnected installs (76.7% of the 60 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved May 12, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 14 | 23.3% | not recorded |
| Net Billing Tariff | 46 | 76.7% | not recorded |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 2 of Mona Lee Inc’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Mona Lee Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Goodleap LLc | 1 |
| MONA LEE INC | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 21 of Mona Lee Inc’s 24 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 38.1%) used modules recorded as LONGi.
In the last 24 months, 24 of Mona Lee Inc’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (9, 37.5%) used inverters recorded as EG4.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | LONGi | 8 | 8 |
| Mitrex | 4 | 7 | |
| UnitedRenewableEnergyCo.,Ltd. | 4 | 23 | |
| JA Solar | 2 | 3 | |
| Qcells | 2 | 9 | |
| Inverter maker | EG4 | 9 | 9 |
| Tesla | 8 | 11 | |
| SolarEdge | 5 | 27 | |
| Enphase | 3 | 14 | |
| Schneider Electric | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 51 of 60 installs, inverters on 60. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Mona Lee Inc as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 63 kWh of storage. 1 have the status Paid, with $1,740 in current incentive allocations. Applications were received from Aug 18, 2023 to Feb 18, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1 | 13 | $1,740 |
| Reserved | 1 | 10 | $1,456 |
| Cancelled | 2 | 40 | $17,727 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 2 | 23 | $3,196 | 1 | $1,740 |
| Large-Scale Storage | 1 | 26 | $6,600 | 0 | $0 |
| Residential Storage Equity | 1 | 13 | $11,127 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1106502 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 31 | ||||
| 972274 | MYERS ELECTRIC COMPANY INC (Corporation) | CLEAR | C-10 Electrical Contractor | Apr 20, 2012 | Aug 31, 2027 | 16 |
| 971156 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Mar 22, 2012 | Mar 31, 2028 | 13 |
License numbers are the ones the utilities recorded on the interconnection applications (60 of 60 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 972274, 971156. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Mona Lee Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2023 | 2024 | 2025 | Total |
|---|---|---|---|---|---|
| City and County of San Francisco | 1106502 | 4 | 10 | 7 | 21 |
| unincorporated San Diego County | 1106502 | 4 | 4 | 1 | 9 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- MONA LEE SOLAR CA LLC: 402 installs, license 1106502
- MYERS ELECTRIC COMPANY INC: 772 installs, license 972274
- SUNGOLD ENERGY: 82 installs, license 971156
Counties
Top cities
| City | Installs |
|---|---|
| San Diego | 17 |
| Oceanside | 4 |
| El Cajon | 3 |
| Escondido | 3 |
| La Mesa | 3 |
| Laguna Niguel | 3 |
| San Juan Capo | 3 |
| San Marcos | 3 |
| Carlsbad | 2 |
| Chula Vista | 2 |
| Lemon Grove | 2 |
| Santee | 2 |
| Spring Valley | 2 |
| Vista | 2 |
| Alpine | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Mona Lee Inc | 60 |
Common questions
Where does Mona Lee Inc install solar?
Its installs are spread across 2 counties. The most are in San Diego County (53 installs), followed by Orange County (7).
How often does Mona Lee Inc install batteries with solar?
Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.
How many Mona Lee Inc installs are under NEM 3.0 (the Net Billing Tariff)?
46 of its 60 interconnected installs (76.7% of the 60 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.