JK Solar Inc

How many solar installs has JK Solar Inc done in California, and which license number is on its installs?

JK Solar Inc has 263 residential solar installs interconnected in California, active in the records from 2010 through 2024 (Dec 2, 2010 to Dec 7, 2024), most of them in San Bernardino County (138), Riverside County (65) and Los Angeles County (23). The license number recorded on most of its installs, 987540, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
263
Last 24 months
1
Total capacity
1,752.4 kW DC
Median system size
6.2 kW DC
With battery storage
0.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.0% of 251 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Dec 7, 2024
Ownership types recorded
PPA 1, lease 4
Median battery size
9.7 kWh (1 installs list a capacity)
First install
Dec 2, 2010
Latest install
Dec 7, 2024
Counties
8
Utilities
SCE 243, SDGE 11, PGE 9
CSLB license
987540

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
2011140
201290
2013120
201480
2015120
2016260
2017340
2018980
2019180
2020170
202160
202230
202310
202441
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 263 interconnected installs (1.5% of the 263 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 25.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 7, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010038.0%not counted
NEM 2.015960.5%0 (0.0%)
Net Billing Tariff41.5%1 (25.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 5 of JK Solar Inc’s installs the utility recorded a third-party ownership type: PPA 1, lease 4, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches JK Solar Inc exactly.

Third-party owner named on its installsInstalls
A1 Solar Power Inc.1
NRG SunCap LLC1
Solar Universe1
Sunnova1
SUNRUN1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of JK Solar Inc’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Solaria.

In the last 24 months, 1 of JK Solar Inc’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of JK Solar Inc’s 1 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolaria1not in top list
Inverter makerSolarEdge1161
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 220 of 263 installs, inverters on 263. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
987540Not found in the CSLB License Master file pulled Nov 4, 2026256

License numbers are the ones the utilities recorded on the interconnection applications (256 of 263 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list JK Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182020Total
unincorporated San Diego County987540112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino138
Riverside65
Los Angeles23
Orange15
San Diego11
Kern6
San Joaquin3
Ventura2

Top cities

CityInstalls
Victorville45
Hesperia20
Adelanto13
Apple Valley13
Moreno Valley9
Lancaster8
Fontana7
Hemet7
Rancho Mirage7
Desert Hot Springs6
Phelan6
Bakersfield5
Menifee5
Palmdale5
Rialto5

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
JK SOLAR INC162
JK Solar Inc45
JK SOLAR29
JK Solar14
JK SOLAR INC.5
JK solar3
JK Solar, Inc3
JK Solar Inc.2

Common questions

Where does JK Solar Inc install solar?

Its installs are spread across 8 counties. The most are in San Bernardino County (138 installs), followed by Riverside County (65).

How often does JK Solar Inc install batteries with solar?

0.4% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many JK Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 263 interconnected installs (1.5% of the 263 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 25.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.