Jamar Power Systems

How many solar installs has Jamar Power Systems done in California, and which license number is on its installs?

Jamar Power Systems has 118 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Jun 13, 2007 to Jun 2, 2026), most of them in San Diego County (89), Riverside County (19) and Orange County (9). CSLB lists license 827648 (JAMAR POWER SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
118
Last 24 months
13
Total capacity
738 kW DC
Median system size
5.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
33.3% of 30 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Jun 2, 2026
Ownership types recorded
lease 10
First install
Jun 13, 2007
Latest install
Jun 2, 2026
Counties
4
Utilities
SDGE 97, SCE 21
CSLB license
827648

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200710
200800
2009120
2010180
2011200
2012310
2013110
201430
201560
201630
201700
201800
201900
202000
202100
202200
202300
202400
202560
2026 (through Aug 31, 2026)70

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 118 interconnected installs (10.2% of the 118 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jun 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010589.0%not counted
NEM 2.010.8%not recorded
Net Billing Tariff1210.2%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Jamar Power Systems’s installs the utility recorded a third-party ownership type: PPA 0, lease 10, prepaid lease 0, other 0. Across all installers, 13 residential systems list a third-party owner name that matches Jamar Power Systems exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC5
Sunpower3
SunPower SolarProgram I, LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of Jamar Power Systems’ 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 45.5%) used modules recorded as PhiladelphiaSolar.

In the last 24 months, 13 of Jamar Power Systems’ 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 53.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhiladelphiaSolar55
REC2not in top list
Silfab2not in top list
SEGSolarInc.1not in top list
Znshine1not in top list
Inverter makerEnphase78
PointGuardEnergyInc.3not in top list
SMA221
Sigenergy1not in top list
Sol-Ark1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 64 of 118 installs, inverters on 56. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Jamar Power Systems as developer on 0 battery storage projects and as installer on 10 (0 name it as both), 10 projects in all with 335 kWh of storage. 8 have the status Paid, with $282,348 in current incentive allocations. Applications were received from May 22, 2020 to Dec 29, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8282$282,348
Cancelled253$31,680

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency9309$308,7488$282,348
Small Residential Storage126$5,2800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
827648JAMAR POWER SYSTEMS (Corporation)CLEARC-10 Electrical ContractorNov 20, 2003Nov 30, 202734

License numbers are the ones the utilities recorded on the interconnection applications (34 of 118 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 827648. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Jamar Power Systems’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County8276481512101261839893

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego89
Riverside19
Orange9
San Bernardino1

Top cities

CityInstalls
San Diego30
El Cajon9
Lakeside8
Murrieta6
Carlsbad5
Corona5
Del Mar5
Ramona5
Santee5
Encinitas4
Escondido4
La Mesa4
Jamul3
Menifee3
Borrego Springs2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Jamar Power Systems110
JAMAR POWER SYSTEMS8

Common questions

Where does Jamar Power Systems install solar?

Its installs are spread across 4 counties. The most are in San Diego County (89 installs), followed by Riverside County (19).

How often does Jamar Power Systems install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Jamar Power Systems installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 118 interconnected installs (10.2% of the 118 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.