GREENPIRE INC

How many solar installs has GREENPIRE INC done in California, and which license number is on its installs?

GREENPIRE INC has 78 residential solar installs interconnected in California, active in the records from 2023 through 2025 (Jun 28, 2023 to Mar 3, 2025), most of them in Los Angeles County (58), Ventura County (9) and Orange County (6). The license number recorded on most of its installs, 1097681, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
78
Last 24 months
36
Total capacity
580.7 kW DC
Median system size
6.8 kW DC
With battery storage
70.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 88.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
46.2% of 78 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
72 installs, latest Mar 3, 2025
Ownership types recorded
PPA 36
Median battery size
5 kWh (53 installs list a capacity)
First install
Jun 28, 2023
Latest install
Mar 3, 2025
Counties
6
Utilities
SCE 76, PGE 1, SDGE 1
CSLB license
1097681

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202380
20246246
202588
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

72 of its 78 interconnected installs (92.3% of the 78 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Mar 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.067.7%0 (0.0%)
Net Billing Tariff7292.3%54 (76.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 36 of GREENPIRE INC’s installs the utility recorded a third-party ownership type: PPA 36, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches GREENPIRE INC exactly.

Third-party owner named on its installsInstalls
LightReach35
Ligght Reach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of GREENPIRE INC’s 36 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 77.8%) used modules recorded as Hyundai.

In the last 24 months, 36 of GREENPIRE INC’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 88.9%) used inverters recorded as Enphase.

In the last 24 months, 32 of GREENPIRE INC’s 36 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (30, 93.8%) used batteries recorded as Enphase.

54 of 54 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai2849
Solaria29
VSUN (Vietnam Sunergy)24
Aptos Solar1not in top list
JinkoSolar1not in top list
Inverter makerEnphase3260
SolarEdge519
Battery makerEnphase3052
LG11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 78 of 78 installs, inverters on 78. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1097681Not found in the CSLB License Master file pulled Nov 4, 202678

License numbers are the ones the utilities recorded on the interconnection applications (78 of 78 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles58
Ventura9
Orange6
Riverside2
San Bernardino2
Kern1

Top cities

CityInstalls
Palmdale5
Whittier5
Los Angeles4
Compton3
Long Beach3
Oxnard3
Calabasas2
Covina2
El Monte2
Hawthorne2
Inglewood2
Lancaster2
Littlerock2
Pasadena2
Santa Clarita2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREENPIRE INC77
Greenpire Inc1

Common questions

Where does GREENPIRE INC install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (58 installs), followed by Ventura County (9).

How often does GREENPIRE INC install batteries with solar?

70.1% of its interconnected solar installs include battery storage across all years, and 88.9% in the last 24 months (32 of 36). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GREENPIRE INC installs are under NEM 3.0 (the Net Billing Tariff)?

72 of its 78 interconnected installs (92.3% of the 78 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.