Green Stock Solar

How many solar installs has Green Stock Solar done in California, and which license number is on its installs?

Green Stock Solar has 600 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jan 17, 2012 to Jul 22, 2026), most of them in Napa County (397), Contra Costa County (65) and Solano County (50). CSLB lists license 961800 (GREEN STOCK SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
600
Last 24 months
56
Total capacity
4,253.4 kW DC
Median system size
6.3 kW DC
With battery storage
1.0% all time; 7.1% last 24 months
Third-party owned
0.0% of 600 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jul 22, 2026
Ownership types recorded
none recorded
First install
Jan 17, 2012
Latest install
Jul 22, 2026
Counties
14
Utilities
PGE 600
CSLB license
961800

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012110
2013190
2014460
2015520
2016470
2017290
2018271
2019420
2020500
2021461
2022690
2023820
2024360
2025231
2026 (through Aug 31, 2026)213

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 600 interconnected installs (3.5% of the 600 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.018030.0%not counted
NEM 2.039966.5%3 (0.8%)
Net Billing Tariff213.5%3 (14.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Stock Solar’s installs. No residential system in the file lists a third-party owner name that matches Green Stock Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 44 of Green Stock Solar’s 56 installs name a module maker in the “Generator Manufacturer” fields, and most of those (42, 95.5%) used modules recorded as REC.

In the last 24 months, 56 of Green Stock Solar’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (55, 98.2%) used inverters recorded as Enphase.

In the last 24 months, 4 of Green Stock Solar’s 56 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC4293
LG1100
Mission Solar1not in top list
Qcells1not in top list
Inverter makerEnphase55594
Fronius14
SolarEdge14
Tesla1not in top list
Battery makerEnphase34
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 536 of 600 installs, inverters on 600. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Green Stock Solar as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 8 kWh of storage. 1 have the status Paid, with $2,938 in current incentive allocations. Applications were received from Aug 10, 2018 to Aug 10, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$2,938

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$2,9381$2,938

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
961800GREEN STOCK SOLAR (Corporation)CLEARC-46 Solar ContractorJun 7, 2011Jul 31, 2027555

License numbers are the ones the utilities recorded on the interconnection applications (555 of 600 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 961800. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Green Stock Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182021Total
City and County of San Francisco961800303
unincorporated Marin County961800011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Napa397
Contra Costa65
Solano50
Alameda25
Santa Clara22
Sonoma16
San Joaquin9
Yolo6
Marin3
Lake2
San Mateo2
Placer1
San Francisco1
Yuba1

Top cities

CityInstalls
Napa347
Vacaville20
Saint Helena16
San Jose12
Calistoga11
Lafayette11
Vallejo10
Moraga9
Concord7
Fairfield7
Tracy7
Angwin6
Benicia6
Danville6
Pleasant Hill6

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN STOCK SOLAR365
Green Stock Solar231
Green Stock solar2
green Stock Solar1
Green stock Solar1

Common questions

Where does Green Stock Solar install solar?

Its installs are spread across 14 counties. The most are in Napa County (397 installs), followed by Contra Costa County (65).

How often does Green Stock Solar install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years, and 7.1% in the last 24 months (4 of 56).

How many Green Stock Solar installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 600 interconnected installs (3.5% of the 600 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.