Green Dragon Solar

How many solar installs has Green Dragon Solar done in California, and which license number is on its installs?

Green Dragon Solar has 36 residential solar installs interconnected in California, active in the records from 2006 through 2024 (May 25, 2006 to Feb 5, 2024), most of them in San Joaquin County (20), Solano County (7) and El Dorado County (4). The license number recorded on most of its installs, 856457, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
36
Last 24 months
0
Total capacity
233.2 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 36 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 25, 2006
Latest install
Feb 5, 2024
Counties
7
Utilities
PGE 36
CSLB license
856457

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200650
200740
200820
200920
201020
201100
201230
201300
201430
201510
201610
201710
201820
201920
202020
202120
202200
202330
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02363.9%not counted
NEM 2.01336.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Dragon Solar’s installs. No residential system in the file lists a third-party owner name that matches Green Dragon Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 34 of Green Dragon Solar’s 36 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 70.6%) used modules recorded as Mitsubishi Electric.

Across all years, 36 of Green Dragon Solar’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 72.2%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMitsubishi Electric024
Panasonic04
Mitsubishi03
Sanyo02
LG01
Inverter makerSMA026
PV Powered09
Xantrex Technology Inc.03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 36 installs, inverters on 36. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
856457Not found in the CSLB License Master file pulled Nov 4, 202618

License numbers are the ones the utilities recorded on the interconnection applications (18 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Joaquin20
Solano7
El Dorado4
Placer2
Contra Costa1
Sutter1
Yolo1

Top cities

CityInstalls
Stockton12
Acampo4
Dixon3
Vacaville2
Danville1
El Dorado Hills1
Fairfield1
Lincoln1
Linden1
Lodi1
Manteca1
Placerville1
Rescue1
Rocklin1
Shingle Springs1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Green Dragon Solar26
GREEN DRAGON SOLAR9
Green DRagon Solar1

Common questions

Where does Green Dragon Solar install solar?

Its installs are spread across 7 counties. The most are in San Joaquin County (20 installs), followed by Solano County (7).

How often does Green Dragon Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Green Dragon Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.