ELIOS

How many solar installs has ELIOS done in California, and which license number is on its installs?

ELIOS has 46 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Nov 29, 2019 to Jul 1, 2026), most of them in San Mateo County (17), Santa Clara County (15) and Alameda County (3). CSLB lists license 1030546 (ELIOS) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
46
Last 24 months
7
Total capacity
492.4 kW DC
Median system size
9.1 kW DC
With battery storage
13.0% all time; 42.9% last 24 months
Third-party owned
0.0% of 46 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jan 23, 2024
Ownership types recorded
none recorded
Median battery size
9.9 kWh (5 installs list a capacity)
First install
Nov 29, 2019
Latest install
Jul 1, 2026
Counties
10
Utilities
PGE 46
CSLB license
1030546

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202080
2021110
202260
202391
202462
202511
2026 (through Aug 31, 2026)42

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 46 interconnected installs (2.2% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 23, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04597.8%5 (11.1%)
Net Billing Tariff12.2%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ELIOS’s installs. Across all installers, 2 residential systems list a third-party owner name that matches ELIOS exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of ELIOS’ 7 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as Canadian Solar.

In the last 24 months, 7 of ELIOS’ 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (3, 42.9%) used inverters recorded as SMA.

In the last 24 months, 2 of ELIOS’ 7 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as LG.

2 of 6 battery-paired PG&E and SCE installs (33.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar228
JA Solar1not in top list
REC1not in top list
SunPower14
Inverter makerSMA332
Shenzhen Growatt New Energy Co., Ltd.24
APsystems (Altenergy Power System)11
Enphase18
GoodWe Technologies Co., Ltd.13
Battery makerLG11
Lithion Battery Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 46 installs, inverters on 46. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1030546ELIOS (Corporation)Work Comp SuspC-10 Electrical ContractorAug 30, 2017Aug 31, 202746

License numbers are the ones the utilities recorded on the interconnection applications (46 of 46 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1030546. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ELIOS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201920212024Total
City and County of San Francisco10305461113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Mateo17
Santa Clara15
Alameda3
San Francisco3
Contra Costa2
San Joaquin2
El Dorado1
Placer1
Santa Barbara1
Sonoma1

Top cities

CityInstalls
Los Altos5
Hillsborough4
Los Gatos3
San Francisco3
San Mateo3
Atherton2
Belmont2
Burlingame2
Los Altos Hills2
Pleasant Hill2
San Jose2
Saratoga2
Stockton2
Berkeley1
Cool1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELIOS46

Common questions

Where does ELIOS install solar?

Its installs are spread across 10 counties. The most are in San Mateo County (17 installs), followed by Santa Clara County (15).

How often does ELIOS install batteries with solar?

13.0% of its interconnected solar installs include battery storage across all years, and 42.9% in the last 24 months (3 of 7).

How many ELIOS installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 46 interconnected installs (2.2% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.