EA DESIGN AND BUILD LLC

How many solar installs has EA DESIGN AND BUILD LLC done in California, and which license number is on its installs?

EA DESIGN AND BUILD LLC has 104 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Mar 29, 2022 to Apr 27, 2026), most of them in Los Angeles County (39), Orange County (39) and Riverside County (12). CSLB lists license 1080602 (EA DESIGN AND BUILD LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
104
Last 24 months
14
Total capacity
832.1 kW DC
Median system size
7.6 kW DC
With battery storage
18.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 42.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.0% of 104 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
24 installs, latest Apr 27, 2026
Ownership types recorded
lease 1
Median battery size
10.5 kWh (18 installs list a capacity)
First install
Mar 29, 2022
Latest install
Apr 27, 2026
Counties
6
Utilities
SCE 95, SDGE 9
CSLB license
1080602

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022162
2023573
2024208
202574
2026 (through Aug 31, 2026)41

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

24 of its 104 interconnected installs (23.1% of the 104 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08076.9%6 (8.5%)
Net Billing Tariff2423.1%12 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of EA DESIGN AND BUILD LLC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches EA DESIGN AND BUILD LLC exactly.

Third-party owner named on its installsInstalls
Sunpower LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of EA DESIGN AND BUILD LLC’s 14 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 42.9%) used modules recorded as Panasonic.

In the last 24 months, 14 of EA DESIGN AND BUILD LLC’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 78.6%) used inverters recorded as Enphase.

In the last 24 months, 6 of EA DESIGN AND BUILD LLC’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used batteries recorded as Enphase.

16 of 18 battery-paired PG&E and SCE installs (88.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic67
Qcells474
JA Solar1not in top list
REC15
Silfab1not in top list
Inverter makerEnphase1158
Tesla34
Battery makerEnphase313
Tesla33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 102 of 104 installs, inverters on 104. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names EA DESIGN AND BUILD LLC as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 19 kWh of storage. 1 have the status Paid, with $19,412 in current incentive allocations. Applications were received from Jun 14, 2023 to Jun 14, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid119$19,412

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency119$19,4121$19,412

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1080602EA DESIGN AND BUILD LLC (Limited Liability)CLEARB General Building ContractorSep 1, 2021Nov 30, 2027104

License numbers are the ones the utilities recorded on the interconnection applications (104 of 104 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1080602. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list EA DESIGN AND BUILD LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County108060211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles39
Orange39
Riverside12
San Bernardino8
Ventura4
San Diego2

Top cities

CityInstalls
Cerritos6
San Clemente6
Irvine5
La Habra Heights5
Cypress4
Huntington Beach4
Corona3
Garden Grove3
Westminster3
Whittier3
Artesia2
Chino2
Chino Hills2
Diamond Bar2
Eastvale2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EA DESIGN AND BUILD LLC95
EA Design and Build9

Common questions

Where does EA DESIGN AND BUILD LLC install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (39 installs), followed by Orange County (39).

How often does EA DESIGN AND BUILD LLC install batteries with solar?

18.9% of its interconnected solar installs include battery storage across all years, and 42.9% in the last 24 months (6 of 14). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many EA DESIGN AND BUILD LLC installs are under NEM 3.0 (the Net Billing Tariff)?

24 of its 104 interconnected installs (23.1% of the 104 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.