Custom Design & Construction
How many solar installs has Custom Design & Construction done in California, and which license number is on its installs?
Custom Design & Construction has 65 residential solar installs interconnected in California, active in the records from 2008 through 2020 (Nov 25, 2008 to May 30, 2020), most of them in Yolo County (58), Colusa County (2) and Alameda County (1). CSLB lists license 765818 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 65
- Last 24 months
- 0
- Total capacity
- 443.3 kW DC
- Median system size
- 5.5 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 65 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Nov 25, 2008
- Latest install
- May 30, 2020
- Counties
- 7
- Utilities
- PGE 65
- CSLB license
- 765818
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2008 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2008 | 1 | 0 |
| 2009 | 15 | 0 |
| 2010 | 1 | 0 |
| 2011 | 13 | 0 |
| 2012 | 10 | 0 |
| 2013 | 7 | 0 |
| 2014 | 6 | 0 |
| 2015 | 2 | 0 |
| 2016 | 2 | 0 |
| 2017 | 2 | 0 |
| 2018 | 4 | 0 |
| 2019 | 1 | 0 |
| 2020 | 1 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 57 | 87.7% | not counted |
| NEM 2.0 | 8 | 12.3% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Custom Design & Construction’s installs. No residential system in the file lists a third-party owner name that matches Custom Design & Construction exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 65 of Custom Design & Construction’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 26.2%) used modules recorded as ET Solar Industry, Ltd..
Across all years, 65 of Custom Design & Construction’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (44, 67.7%) used inverters recorded as SMA.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | ET Solar Industry, Ltd. | 0 | 17 |
| Qcells | 0 | 10 | |
| Schuco USA LP | 0 | 9 | |
| SolarWorld | 0 | 7 | |
| Baoding Yingli New Energy Res Co | 0 | 4 | |
| Inverter maker | SMA | 0 | 44 |
| Enphase | 0 | 7 | |
| Schuco USA LP | 0 | 6 | |
| Fronius | 0 | 3 | |
| Xantrex Technology Inc. | 0 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 65 of 65 installs, inverters on 65. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 765818 | Sole owner license (name not shown) | CLEAR | B General Building Contractor | Jul 15, 1999 | Jul 31, 2027 | 13 |
License numbers are the ones the utilities recorded on the interconnection applications (13 of 65 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 765818. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
Top cities
| City | Installs |
|---|---|
| Woodland | 21 |
| Davis | 9 |
| Capay | 6 |
| Esparto | 6 |
| Dunnigan | 5 |
| West Sacramento | 4 |
| Arbuckle | 2 |
| Brooks | 2 |
| Guinda | 2 |
| Antioch | 1 |
| Live Oak | 1 |
| Madison | 1 |
| Pleasanton | 1 |
| Rocklin | 1 |
| Rumsey | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Custom Design & Construction | 44 |
| Custom Design and Construction | 20 |
| Custom Design & construction | 1 |
Common questions
Where does Custom Design & Construction install solar?
Its installs are spread across 7 counties. The most are in Yolo County (58 installs), followed by Colusa County (2).
How often does Custom Design & Construction install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Custom Design & Construction installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.