Custom Design & Construction

How many solar installs has Custom Design & Construction done in California, and which license number is on its installs?

Custom Design & Construction has 65 residential solar installs interconnected in California, active in the records from 2008 through 2020 (Nov 25, 2008 to May 30, 2020), most of them in Yolo County (58), Colusa County (2) and Alameda County (1). CSLB lists license 765818 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
65
Last 24 months
0
Total capacity
443.3 kW DC
Median system size
5.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 65 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Nov 25, 2008
Latest install
May 30, 2020
Counties
7
Utilities
PGE 65
CSLB license
765818

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200810
2009150
201010
2011130
2012100
201370
201460
201520
201620
201720
201840
201910
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05787.7%not counted
NEM 2.0812.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Custom Design & Construction’s installs. No residential system in the file lists a third-party owner name that matches Custom Design & Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 65 of Custom Design & Construction’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 26.2%) used modules recorded as ET Solar Industry, Ltd..

Across all years, 65 of Custom Design & Construction’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (44, 67.7%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerET Solar Industry, Ltd.017
Qcells010
Schuco USA LP09
SolarWorld07
Baoding Yingli New Energy Res Co04
Inverter makerSMA044
Enphase07
Schuco USA LP06
Fronius03
Xantrex Technology Inc.03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 65 of 65 installs, inverters on 65. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
765818Sole owner license (name not shown)CLEARB General Building ContractorJul 15, 1999Jul 31, 202713

License numbers are the ones the utilities recorded on the interconnection applications (13 of 65 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 765818. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Yolo58
Colusa2
Alameda1
Contra Costa1
Placer1
Solano1
Sutter1

Top cities

CityInstalls
Woodland21
Davis9
Capay6
Esparto6
Dunnigan5
West Sacramento4
Arbuckle2
Brooks2
Guinda2
Antioch1
Live Oak1
Madison1
Pleasanton1
Rocklin1
Rumsey1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Custom Design & Construction44
Custom Design and Construction20
Custom Design & construction1

Common questions

Where does Custom Design & Construction install solar?

Its installs are spread across 7 counties. The most are in Yolo County (58 installs), followed by Colusa County (2).

How often does Custom Design & Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Custom Design & Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.