Clean Power Solutions

How many solar installs has Clean Power Solutions done in California, and which license number is on its installs?

Clean Power Solutions has 36 residential solar installs interconnected in California, active in the records from 2004 through 2023 (Jan 16, 2004 to Apr 27, 2023), most of them in Orange County (19), San Diego County (13) and Riverside County (3). CSLB lists license 774491 (CLEAN POWER SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
36
Last 24 months
0
Total capacity
287.9 kW DC
Median system size
7.4 kW DC
With battery storage
6.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
4.3% of 23 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1
Median battery size
29.9 kWh (1 installs list a capacity)
First install
Jan 16, 2004
Latest install
Apr 27, 2023
Counties
4
Utilities
SDGE 20, SCE 16
CSLB license
774491

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200410
200500
200600
200700
200800
200980
201050
201110
201210
201300
201400
201561
201650
201730
201820
201910
202010
202110
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02877.8%not counted
NEM 2.0822.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Clean Power Solutions’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Clean Power Solutions exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Spruce1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 23 of Clean Power Solutions’ 36 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 39.1%) used modules recorded as Canadian Solar.

Across all years, 36 of Clean Power Solutions’ 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 80.6%) used inverters recorded as SMA.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar09
Trina Solar08
Qcells02
Hyundai01
REC01
Inverter makerSMA029
SolarEdge03
Enphase01
Pika Energy01
PV Powered01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 23 of 36 installs, inverters on 36. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Clean Power Solutions as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 69 kWh of storage. 1 have the status Paid, with $19,898 in current incentive allocations. Applications were received from Dec 28, 2013 to Dec 28, 2013.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid122$19,898
Cancelled147$42,029

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated269$61,9271$19,898

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
774491CLEAN POWER SOLUTIONS (Corporation)CLEARC-10 Electrical ContractorFeb 3, 2000Feb 29, 202822

License numbers are the ones the utilities recorded on the interconnection applications (23 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 774491. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Orange19
San Diego13
Riverside3
San Bernardino1

Top cities

CityInstalls
Laguna Hills8
Laguna Niguel5
Mission Viejo3
Lake Forest2
Vista2
Carlsbad1
Costa Mesa1
Hemet1
Irvine1
Laguna Beach1
Menifee1
Morongo Valley1
Newport Beach1
Oceanside1
Poway1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Clean Power Solutions21
CLEAN POWER SOLUTIONS15

Common questions

Where does Clean Power Solutions install solar?

Its installs are spread across 4 counties. The most are in Orange County (19 installs), followed by San Diego County (13).

How often does Clean Power Solutions install batteries with solar?

6.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Clean Power Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 36 interconnected installs with a tariff recorded (36) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.