Calzona Solar

How many solar installs has Calzona Solar done in California, and which license number is on its installs?

Calzona Solar has 167 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Dec 11, 2018 to Aug 3, 2026), most of them in Riverside County (66), San Bernardino County (37) and Los Angeles County (28). CSLB lists license 1064904 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
167
Last 24 months
45
Total capacity
1,510.2 kW DC
Median system size
8.8 kW DC
With battery storage
17.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 46.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 167 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
47 installs, latest Aug 3, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (26 installs list a capacity)
First install
Dec 11, 2018
Latest install
Aug 3, 2026
Counties
5
Utilities
SCE 153, SDGE 14
CSLB license
1064904

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201970
2020141
2021150
2022160
2023461
2024265
2025189
2026 (through Aug 31, 2026)2410

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

47 of its 167 interconnected installs (28.1% of the 167 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 51.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.012071.9%2 (1.9%)
Net Billing Tariff4728.1%24 (51.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Calzona Solar’s installs. No residential system in the file lists a third-party owner name that matches Calzona Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 45 of Calzona Solar’s 45 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 51.1%) used modules recorded as Qcells.

In the last 24 months, 45 of Calzona Solar’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (43, 95.6%) used inverters recorded as Enphase.

In the last 24 months, 21 of Calzona Solar’s 45 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 90.5%) used batteries recorded as Enphase.

26 of 26 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells23103
LONGi1111
Aptos Solar33
JA Solar33
EliTe Solar Power HongKong Limited1not in top list
Inverter makerEnphase43128
Qcells12
Tesla12
Battery makerEnphase1923
Qcells11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 163 of 167 installs, inverters on 167. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1064904Sole owner license (name not shown)CLEARC-46 Solar ContractorApr 3, 2020Apr 30, 2028159

License numbers are the ones the utilities recorded on the interconnection applications (167 of 167 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1064904. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Calzona Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202020222023Total
unincorporated San Diego County10649041113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside66
San Bernardino37
Los Angeles28
Orange22
San Diego14

Top cities

CityInstalls
Corona25
Norco6
Ontario6
San Diego6
Arcadia5
Eastvale5
Redlands5
Riverside5
Lake Elsinore4
Murrieta4
Perris4
Alta Loma3
Hemet3
Huntington Beach3
Orange3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALZONA SOLAR134
Calzona Solar33

Common questions

Where does Calzona Solar install solar?

Its installs are spread across 5 counties. The most are in Riverside County (66 installs), followed by San Bernardino County (37).

How often does Calzona Solar install batteries with solar?

17.0% of its interconnected solar installs include battery storage across all years, and 46.7% in the last 24 months (21 of 45). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Calzona Solar installs are under NEM 3.0 (the Net Billing Tariff)?

47 of its 167 interconnected installs (28.1% of the 167 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 51.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.